Laserfiche WebLink
• NSI will create new Radio profiles that will be applied to the AP Groups. The same AP Radio Profile can be deployed <br />to multiple groups. At a minimum there will be an Indoors Radio Profile (internal coverage) and an Outdoors Radio <br />Profile (public wifi coverage) to be created. A maximum of 4 additional radio profiles may be configured within this <br />project. Additional radio profiles need beyond a maximum of 4 is outside the scope of this project and will require a <br />change order <br />• NSI will reconfigure the switching infrastructure if necessary for the new controllers to connect and operate with the <br />existing equipment. Further configuration of switches is outside the scope of this project unless explicitly specified in <br />other sections of this scope of work. <br />• NSI will migrate the VLAN SVI configurations to the CoSB core for switch and AP management. These will be <br />necessary to access the DTSB switching equipment. DTSB management VLANs may need to be spanned across some <br />existing equipment as well. NSI will perform the VLAN span task up to 10 switches. The change of VLANs or IP <br />addresses on the existing DTSB equipment is outside the scope of this proiect. A change order would be needed to <br />redesign and ireconfigure these switches throughout the city. <br />• NSI will review the configuration and make any additional changes to the final configuration that are recommended <br />• NSI will test the wireless systems connectivity after the installation. It will also be verified that all connected APs prior <br />to the change are online and communicating with the new controller. <br />• CoSB will provide necessary site and infrastructure access as needed for full configuration of the new wireless system <br />• CoSB will available to assist with the testing phase of this project to verify proper operation and access to the <br />resources listed in the testing plan <br />• CoSB will provide DHCP services for any new networks that are created. <br />Security <br />• NSI will provide onsite installation services. This may entail an NSI installation engineer onsite with remote <br />support provided by an NSI security engineer. <br />• NSI will configure firewall policies based on the populated data collection workbook. <br />• NSI will review all policy configuration, will advise CoSB on the implementation of configuration best practices, and <br />make any recommended changes approved by CoSB. <br />• Implementation of certain components of this solution may be intrusive. CoSB is responsible for coordinating an <br />appropriate downtime window. <br />Testing Ides onsibiliti'es: <br />Network -Wide <br />• NSI and CoSB will test access to the critical services identified in the testing plan. <br />Wireless <br />• NSI will verify proper operation of the installed equipment as identified in the testing plan. <br />Training Support Responsibilities, <br />Network -Wide <br />• No training is included as part of this proposal <br />Infrastructure Final Deliverables <br />Following the completion of training and support, NSI and CoSB will review the work completed. As part of this <br />review NSI will provide the following: <br />Network -Wide <br />• NSI will provide documentation of the testing results including identified critical services, initial testing result, any <br />www.nsil.com WliY we do Its as cis WiAlvve o, <br />