My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12112018 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2018
>
12112018 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:24:30 PM
Creation date
12/21/2018 10:14:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING DECEMBER 11 2018 379 <br />2019 BOARD OF PUBLIC WORKS MEETING SCHEDULES <br />Upon a motion by Ms. Maradik, seconded by Ms. Dorau and carried, the Board approved the <br />2019 Agenda Review, Regular Meeting, and Claims Review Meeting schedules as presented. <br />OPENING OF BIDS — SMALL, DRAINAGE DESIGN AND REPAIR — PROJECTNO, 118- <br />063 (LRhSA/SSDA TIF) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />WALSH & ]ULLYINC <br />24358 SR 23 <br />South Bend, IN 46614 <br />Bid was signed by: Dustin Hilary <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Division A Total <br />$144,895.50 <br />Alternate AI Total <br />$135,900.00 <br />Alternate A2 Total <br />$133,004.00 <br />Division B Total <br />$140,000.00 <br />Division C Total <br />$72,200.00 <br />Division C1 Total <br />$28,000.00 <br />Division A+B+C <br />Total <br />$653,999.50 <br />G.E. MARSHALL INC <br />1351 Joliet Rd. <br />Valparaiso, IN 46385 <br />Bid was signed by: Frank Marshall <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />:G <br />Division A Total <br />$135,628.00 <br />Alternate Al Total <br />$155,205.00 <br />Alternate A2 Total <br />$143,419.00 <br />Division B Total <br />$122,128.00 <br />Division C Total <br />$94,133.00 <br />Division CI Total <br />$32,124.00 <br />Division A+B+C <br />Total <br />$351,889.00 <br />*Note: Total without alternates <br />SELGE CONSTRUCTION CO. INC. <br />2833 S. 11 "' Street <br />Niles, MI 49120 <br />Bid was signed by: Robert Kuhns <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />s <br />Division A Total <br />$163,241.83 <br />Alternate Al Total <br />$124,024.80 <br />Alternate A2 Total <br />$147,358.44 <br />Division B Total <br />$104,768.28 <br />Division C Total <br />$87,234.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.