Laserfiche WebLink
(ITY OF SOUTH BEND <br />A RELEVANT EXPERIEKE <br />146TH STREET EXTENSION FROM SR 37 (R 17 BYPASS PROJE(T - <br />The overall project was divided into two phases: Elkhart <br />CR 17 Phase UAfrom CR 28 to CR 30, and Elkhart CR <br />17 Phase UB from CR 30to CR 32. Phase UAinc|uded <br />new construction of pavement and multiple drainage <br />structures with over 100'000 cubic yards of fi|| for <br />embankment construction. Phase ||B included two <br />new bridges and over 500,000 cubic yards of borrow <br />for embankment construction and the use of newly <br />constructed 17-acreborrow pit aswell asthe placement <br />ofmultiple drainage structures and two new bridges. <br />The project was designed byanother engineering firm <br />and UNITED provided construction engineering services <br />for both phases of the bypass project. <br />Construction Cost: $11K4iUion <br />Services Provided. Construction Inspection <br />Construction Cost: $26K4iUion <br />Services Provided: Survey, Project Management <br />Services, Roadway Design, Hydraulic Design, Retention <br />Letter of Interest to Provide Construction Inspection Services I Reconstruction of Bendix Drive ��#* 11 <br />