Laserfiche WebLink
solutions (engineering based) to be developed and examined. <br />With an average of nearly 30 years of experience per construc- <br />tion inspector, our staff addresses all project issues utilizing a <br />well-rounded experience -based approach. <br />The previous experience LFA personnel has with INDOT <br />and LPA projects results in improved understanding of IN - <br />DOT expectations, leading to reduced occurrences of submit- <br />tal errors and mis-communications, which ultimately result in <br />savings of both time and cost. <br />The LFA team has experienced design professionals available <br />to provide design manual interpretations and applications that <br />may present themselves during construction. Utilizing these <br />professionals will ultimately reduce the time required to re- <br />spond to design -related questions that may arise. <br />LFA has multiple sets of all required field testing equipment <br />and light weight deflectometers necessary to sample and test <br />materials in accordance with INDOT specifications and pro- <br />cedures. Our equipment is calibrated annually, or as necessary, <br />to maintain a ready condition for immediate use in accordance <br />with project assignments. The INDOT General Instructions to <br />Field Employees and Manual for Frequency of Sampling and <br />Testing will be strictly followed. <br />Why The LFA Team? <br />► Multiple staff have successfully supervised past <br />LPA/INDOT construction projects and are trained in <br />the appropriate testing and reporting requirements. <br />► Collective LFA experience in construction management of <br />roundabouts. <br />► Our q f ce and inspection staff are located within 4 miles of <br />the project. <br />► Awareness of City of South Bend's needs and expectations. <br />J <br />510 <br />f <br />I <br />r <br />so <br />,. <br />As seen above, LFA averages approximately eight (8) <br />projects with a construction value of $15 million dollars <br />a year. Currently, LFA's inspection team has completed or <br />are completing seven (7) projects with a total of $10 mil- <br />lion dollars in 2018. 2019 currently has one assignment <br />and 2020 has full available capacity. <br />Our 2020 construction inspection workload is currently <br />clear and we are extremely confident in our ability to staff this <br />project. Our prior experiences promote a comprehensive un- <br />derstanoiiig of your inspection needs. Examples of our ability <br />to provide flexibility and capacity are evident on each of the <br />projects described in the Relevant Experience section of this <br />proposal. <br />LFA ,j�, A City of South Bend, Indiana - Construction Inspection for Bendix Drive - Lathrop Street to I-80 Bridges - Des. No. 1400634 <br />z AW10*4MMOR A$$a C%'rs8 w.c. <br />