Laserfiche WebLink
G.E. MARSHALL, INC. <br />THREE TWENTY AT THE CASCADE — SITE UTILITIES <br />DECEMBER 11, 2018 <br />State Board of Accounts <br />Form 96 <br />Section II Plan and Equipment Questionnaire <br />Division C — Site Storm Sewer <br />1. <br />Install 6" SDR 35 PVC pipe w/ all fittings <br />2. <br />Install 24" perforated HDPE pipe w/ all fittings <br />3. <br />Install Drywells <br />4. <br />Install catch basins <br />5. <br />Install French drain <br />6. <br />Testing for storm sewer <br />7. <br />Maintenance of traffic for storm sewer <br />8. <br />Asphalt pavement replacement for site storm sewer <br />9. <br />Concrete sidewalk replacement for site storm sewer <br />10. <br />Concrete curb replacement for site storm sewer <br />