My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Site Utilities Project No 118-074D - G.E. Marshall Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Site Utilities Project No 118-074D - G.E. Marshall Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:22:24 PM
Creation date
12/12/2018 1:12:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G.E. MARSHALL, INC. <br />THREE TWENTY AT THE CASCADE — SITE UTILITIES <br />DECEMBER 11, 2018 <br />State Board of Accounts <br />Form 96 <br />Section II Plan and Equipment Questionnaire <br />#1: SCOPE OF WORK <br />Division A — Site Water Service <br />I. Mobilization/Demobilization <br />2. Provide construction layout <br />3. Install 6" Class 50 DIP w/all fittings and valves <br />4. Install 4" Class 51 DIP w/all fittings and valves <br />5. Install Fire Hydrant w/valve, box and fittings <br />6. 1" Copper tube, valves and fittings for flushing <br />7. Tap Fees <br />8. Plumber test all fittings and valves <br />9. Final testing for site water service <br />10. Maintenance of traffic for site water service work <br />11. Asphalt pavement replacement for site water service <br />12. Concrete sidewalk replacement for site water service <br />13. Concrete curb replacement for site water service <br />Division B — Site Sanitary Sewer <br />1. Install 8" PVC SDR 35 pipe w/ all fittings <br />2. Install 6" PVC SDR 35 PVC pipe w/ all fittings <br />3. Install sanitary manhole WW-1 and casting <br />4. 6" cleanouts <br />5. 4" cleanout <br />6. Core and boot existing manhole <br />7. Final testing for site sanitary sewer <br />8. Maintenance of traffic for site sanitary sewer work <br />9. Asphalt replacement for the site sanitary sewer <br />10. Concrete sidewalk replacement for site sanitary <br />11. Concrete curb replacement for site sanitary sewer work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.