Description:
<br />INDOT R33572A, Gumwood Ph II Added Travel Lanes, Bike, and Pedestrian Facilities.
<br />Owner IN Dept of Transportation., Mishawaka, IN. Added travel lanes, bike, and pedestrian
<br />facilities on Gurnwood Rd from Brick Rd to Michigan State Line. Concrete curb, driveways, and
<br />sidewalk/bike paths, retention pond basin, storm sewer, I round about at Gurnwood & Adams
<br />Rds, streetscapes and landscaping. $4,463,899.63 Year Completed: 2015
<br />Description:
<br />INDOT R3029 ' 1A, Gumwood Ph I Added Travel Lanes. Owner IN Dept of Transportation.,
<br />Mishawaka IN. Added travel lanes from Mishawaka Corp limits to Candy Lane, Completed
<br />clearing of right of way, 39,203 cubic yards. 31,996 square yards of subgrade treatment, 1,686
<br />ton of compacted aggregate no. 73, 27,572 ton QC/QA HMA, 260 square yards PCCP, 10,153
<br />square yards concrete sidewalk, 15,207 linear feet concrete curb & gutter, 726 square yards -
<br />PCCP, 25,391 linear feet of sanitary/water main pipe, retention pond basin, water main, I round-
<br />about at Gurnwood & Brick Rds, streetscapes and landscaping $3,819,947.67 Year Completed:
<br />2015
<br />Description:
<br />INDOT R34218A, 12t' St. Added Travel Lanes. Owner IN Dept of Transportation,
<br />Mishawaka, IN. Added travel lanes on 12'h St from Capital Avenue to Blackberry Road.
<br />Completed clearing of right away, 23,366 cubic yards, 4,001 tons of compacted aggregate no. 53,
<br />4,389 square yards of concrete sidewalk, 197 square yards of concrete curb ramp, 11,115 linear
<br />feet of concrete curb & gutter, 1,174 square yards of PCCP for approaches, 16,938 linear feet of
<br />storm pipe $3,707,799.63 Year Completed: 2015
<br />Description:
<br />Fort Wayne Leo Cedarville I'D" RSD. Owner Leo Cedarville Regional Sewer District, Fort
<br />Wayne, IN. Replacement of the existing pump station with new wet wells, valve vaults, pumps,
<br />piping and control panels. $360,,427.69 Year Completed: 2015
<br />Description:
<br />Howard Township Lift Station Upgrade Project. Owner: Howard Township, Niles, MI.
<br />Installed 6 Lift Stations, 10 Arborvitae and various appurtances. $130,415.00 Year Completed:
<br />2014.
<br />Description:
<br />Jefferson Boulevard Streetscape / Main to Eddy Streets. Owner: City of South Bend,
<br />Indiana Department of Public Works. Construction of streetscape project, including
<br />approximately 5500 SY of asphalt, 2300 LF concrete curb, 2650 SY concrete sidewalk, 470 SY
<br />pervious pavers,, Storm sewer structures and 2250 LF storm sewer. Install and replace light pole
<br />assemblies, trees and various plants and signage. $1,603,688.00. Year Completed: 2014.
<br />
|