Laserfiche WebLink
Description: <br />INDOT R33572A, Gumwood Ph II Added Travel Lanes, Bike, and Pedestrian Facilities. <br />Owner IN Dept of Transportation., Mishawaka, IN. Added travel lanes, bike, and pedestrian <br />facilities on Gurnwood Rd from Brick Rd to Michigan State Line. Concrete curb, driveways, and <br />sidewalk/bike paths, retention pond basin, storm sewer, I round about at Gurnwood & Adams <br />Rds, streetscapes and landscaping. $4,463,899.63 Year Completed: 2015 <br />Description: <br />INDOT R3029 ' 1A, Gumwood Ph I Added Travel Lanes. Owner IN Dept of Transportation., <br />Mishawaka IN. Added travel lanes from Mishawaka Corp limits to Candy Lane, Completed <br />clearing of right of way, 39,203 cubic yards. 31,996 square yards of subgrade treatment, 1,686 <br />ton of compacted aggregate no. 73, 27,572 ton QC/QA HMA, 260 square yards PCCP, 10,153 <br />square yards concrete sidewalk, 15,207 linear feet concrete curb & gutter, 726 square yards - <br />PCCP, 25,391 linear feet of sanitary/water main pipe, retention pond basin, water main, I round- <br />about at Gurnwood & Brick Rds, streetscapes and landscaping $3,819,947.67 Year Completed: <br />2015 <br />Description: <br />INDOT R34218A, 12t' St. Added Travel Lanes. Owner IN Dept of Transportation, <br />Mishawaka, IN. Added travel lanes on 12'h St from Capital Avenue to Blackberry Road. <br />Completed clearing of right away, 23,366 cubic yards, 4,001 tons of compacted aggregate no. 53, <br />4,389 square yards of concrete sidewalk, 197 square yards of concrete curb ramp, 11,115 linear <br />feet of concrete curb & gutter, 1,174 square yards of PCCP for approaches, 16,938 linear feet of <br />storm pipe $3,707,799.63 Year Completed: 2015 <br />Description: <br />Fort Wayne Leo Cedarville I'D" RSD. Owner Leo Cedarville Regional Sewer District, Fort <br />Wayne, IN. Replacement of the existing pump station with new wet wells, valve vaults, pumps, <br />piping and control panels. $360,,427.69 Year Completed: 2015 <br />Description: <br />Howard Township Lift Station Upgrade Project. Owner: Howard Township, Niles, MI. <br />Installed 6 Lift Stations, 10 Arborvitae and various appurtances. $130,415.00 Year Completed: <br />2014. <br />Description: <br />Jefferson Boulevard Streetscape / Main to Eddy Streets. Owner: City of South Bend, <br />Indiana Department of Public Works. Construction of streetscape project, including <br />approximately 5500 SY of asphalt, 2300 LF concrete curb, 2650 SY concrete sidewalk, 470 SY <br />pervious pavers,, Storm sewer structures and 2250 LF storm sewer. Install and replace light pole <br />assemblies, trees and various plants and signage. $1,603,688.00. Year Completed: 2014. <br />