Laserfiche WebLink
Description: <br />Buchanan Bertrand Twp Foundation Dr. Owner: Saratore Co., Inc. Excavation, CIP Basin <br />32,000 cubic yards, excavation CIP building pad topsoil strip for embankment areas 5,500 cubic <br />yards, Excavation, CIP, building pad drive & parking 2,000 cubic yards, excavation CIP road <br />2,540 cubic yards, berm & swale 625 linear feet, 2,837 ton #22A gravel base, 735 ton #23A <br />compact aggregate, 2 10 ton #23A gravel for approaches, 4,570 linear feet sewer pipe, 3,650 <br />linear feet concrete curb, gutter, and driveway; 2,082 linear feet water main, 2,865 cubic yards <br />topsoil and subgrade treatment. $695,238.00 Year Completed: 2015 <br />Description: <br />Middlebury Water Treatment Plant Upgrades. Owner: Town of Middlebury, IN. 72 linear <br />feet of 8" ductile iron pipe, Valve & flow meter relocation, 8", 12" butterfly valves $112,681.00 <br />Year Completed: 2015 <br />Description: <br />Lagrange Dometic Corp Improvements Ph I. Owner: Dometic, Corp, Lagrange, IN. Remove <br />4,3 25 square yards of asphalt, remove 1,03 5 square yards of concrete, 3 00 . ton of #53 aggregate <br />base, 225 ton asphalt patching, 3,428 square yards 8" PCCP, 3,715 square yards 10" PCCP. <br />$29,218.70 Year Completed: 2015 <br />Description: <br />Mishawaka Ave Improvements Phase I. Owner: City of Mishawaka, IN, Board of Public <br />Works. Clearing right of way, 6,239 ton hot mix asphalt, 5,266 linear feet concrete curb & gutter, <br />4,608 square yards concrete sidewalk, 3,273 linear feet storm sewer pipe, 780 linear feet water <br />main pipe, 7,483 linear feet CIPP sanitary sewer pipe, 710 linear feet 8" SDR 35 sanitary sewer. <br />$4,128,388.84 Year Completed 2015 <br />Description: <br />Winona Main Wastewater Pumping Station Replacement. Owner: Town of Winona, IN. <br />Clearing right of way, 17 linear feet of 8" D.I. force main, 10 1 linear feet 18" PVC sanitary <br />sewer, 900 GPM Triplex lift station, 210 cubic yards structural backfill. $546,689.00 Year <br />Completed: 2015 <br />Description <br />Cassopolis Peavine St. Lift Station Improvement., Owner Village of Cassopolis, Cassopolis, <br />MI. Renovation of the Peavine Street lift Station, 12" extension for 72" wet well, plugging leaks, <br />Chamfer removal, new floor in wet well. $45,815.00 Year Completed: 2015 <br />Description: <br />INDOT R36481A Twin Branch/Vistula Dr. Sidewalk Improvements. Owner IN Dept of <br />Transportation,, Mishawaka, IN. Sidewalk improvements along Vistula Rd and Elder Street at <br />the Twin Branch Elementary School. $285,393.12 Year Completed: 2015 <br />