Laserfiche WebLink
Description: <br />Precision Wall Systems Storm Sewer & Lot Upgrades. Owner: Precision Wall Systems. 825 <br />linear feet of storm sewer, 6 each 30" catch basins, remove 40 linear feet of retaining wall, <br />remove 3 5 0 square yards of pavement, 1,000 cubic yards of retention pond, 3 5 0 square yards <br />concrete drive 6", 160 linear feet concrete curb, 80 linear feet concrete retaining wall, 1890 <br />square yards grading for HAC and concrete areas, 1,540 square yards HAC pavement. <br />$137,694.74 Year Completed: 2015 <br />Description: <br />South Bend Edison Rd LS Access Road Construction. Owner: City of South Bend Board of <br />Public Works. 174 square yards aggregate #53 6" base depth, 175 square yards geosynthetic <br />fabric, 175 square yards B borrow 12" depth, adjust casting to grade. $15,659.25 Year <br />Completed: 2015 <br />Description: <br />South Bend Geyer Ditch LS Access Road Construction. Owner: City of South Bend Board of <br />Public Works. Adjust casting to grade, concrete collar, 4,700 square yards compacted aggregate <br />#53 at 6", 4,700 square yards Geosynthetic fabric. $72,410.00 Year Completed: 2015 <br />Description: <br />Cassopolis Lift Station #1 Renovation. Owner: Village of Cassopolis. Lift station #1 <br />rehabilitation, restoration, masonry and concrete structure rem, charnfer removal, concrete <br />surfacing 2", standby generator LS #1. $131,550.00 Year Completed: 2015 <br />Description: <br />Goshen 321 South 3rd Street Parking Lot. Owner: City of Goshen. Remove 270 square yards <br />full depth concrete, remove 18 square yards concrete sidewalk, remove existing storm sewer <br />structure, I IS ton #53 recycled concrete base, 40 linear feet 4" concrete sidewalk, 315 square <br />yards 6" concrete, landscape restoration. $53,525.53 Year Completed: 2015 <br />Description: <br />Warsaw Central Park Storm Sewer Cleaning project. Owner City of Warsaw. Install & <br />remove inflatable plug, clean & video 36" diameter storm sewer, install manhole over existing <br />storm sewer. $42,050.00 Year Completed: 2015 <br />Description: <br />South Bend 2015 Curb/Sidewalk Construction Div. B. Owner: City of South Bend Board of <br />Public Works, IN. Remove 3,000 linear feet curb & 395 square yard sidewalk, 3,000 linear feet <br />new curb & 395 square yards new sidewalk, remove & replace 11 trees, grade/sod 998 square <br />yards. $257,718 Year Completed: 2015 <br />Description: <br />Mishawaka Front St Roundabout Reconstruction. Owner: City of Mishawaka Board of <br />Public Works, IN. 826 square yards QC/QA PCCP, 581 linear feet concrete curb, 14 square <br />yards topsoil. S105,701.04 Year Completed: 2015 <br />