Laserfiche WebLink
Description: <br />Niles 2016 Sewer Improvements — Owner: City of Niles. 15" sewer repair, 8" sewer repair, <br />remove (7) 12" cross connection pipes, 12" flowable cross connection, replace manhole cover. <br />$92,815.00 Year Completed: 2016 <br />Description: <br />Niles Township Manhole Repairs — Owner: Niles Township. Casting adjustments on 93 <br />various manholes throughout the township. $62,590.00 Year Completed: 2016 <br />Description: <br />South Bend INfl7ek IN/Kote Sanitary Sewer Improvements — Owner: City of South Bend. <br />Install 12" thick concrete base slab for storage tank & feed pumps, provide and install HD cross - <br />linked polyethylene chemical storage tanks, install dual bellows type chemical metering pumps, <br />suction pipes, discharge PVC piping to lift station wet well, install fill station & piping, provide <br />115 VAC electric service to each pump with 20 amp breaker within lift station, 8 hours training <br />to staff. $167,850.00 Year Completed: 2016 <br />Description: <br />Elkhart Downtown Parking ADA Improvements — Owner: City of Elkhart. 28 square yards <br />ADA curb ramp, 25 square yards ADA sidewalk, 7 square yards 9" concrete, 40 linear feet <br />concrete curb and gutter. $14,435.00 Year Completed: 2016 <br />Description: <br />Elkhart Indiana Flight Center Apron Upgrades — Owner: Elkhart Municipal Airport. 539 <br />cubic yards common excavation, 465 tons #53 recycled concrete, 1382 square yards 8" concrete <br />pavement, restored area. $143,730.00 Year Completed: 2016 <br />Description: <br />Middlebury East Warren St. Sidewalk Improvements — Owner: Town of Middlebury. Clear <br />area to be improved, 20 ton HMA for pavement patching, 2,010 square yards 4" sidewalk, 60 <br />linear feet concrete curb & gutter, 134 square yards concrete ramps, 1,850 square yards mulched <br />seeding on topsoil, site grading, accent lighting. $299,880.29 Year Completed: 2016 <br />Description: <br />South Bend St. Paul's Senior Center Parking Lot Improvements — Owner: Trinity <br />Continuing Care Center. Slope reconstruction with 1200 square feet of erosion protection system <br />with 160 cubic yards of structural backfill, 50 square yards of sod, 112 linear feet 15" ADS HP <br />storm sewer, 195 linear feet 18" ADS HP storm sewer, (4) storm manholes, riprap on geotextile <br />at pipe discharge, 90 linear feet of 6" concrete curb. $166,333.00 Year Completed., 2016 <br />Description: <br />Mishawaka Bodine Fish Hatchery — Owner: Bodine State Fish Hatchery. Remove existing <br />asphalt surface, excavate pits for valve insertion and water main taps, install (2) 12" gate valves, <br />install (6) 4" gate valves with box, install 40 ton 6" #53 aggregate base, restore surface areas <br />with 100 square yards 6" concrete pavement. S 100,970.00 Year Completed: 2016 <br />