My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Small Drainage Design and Repair Project No 118-063 - Selge Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Small Drainage Design and Repair Project No 118-063 - Selge Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:10:54 AM
Creation date
12/12/2018 1:10:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rehabilitation. In Place Generator for Lift Station #3 and Reed St Lift Station. Remove and <br />replace fencing and gates. Replace all control panels, outdoor lighting. 60 linear feet of 8" <br />sanitary sewer and manholes, 165 linear feet of 2" forcemain'. 230 square yards concrete <br />pavement & sidewalk replacement. $1,316,160 Year Completed: 2017 <br />Description: <br />Elkhart ADA RR Depot Parking Lot Improvements — Owner: City of Elkhart. Creating <br />section of the parking areas around the RR Depot to be accessible and ADA compliant by <br />installing (1) curb ramp and 125 square yards of stamped concrete and 20 feet of retaining wall. <br />$23,865 Year Completed: 2017 <br />Description: <br />Warsaw Osborn Stormwater Pump Station — Owner: City of Warsaw Board of Public <br />Works/Safety. Perform upgrades to pump station per engineer's specifications. $197,240 Year <br />Completed: 2017 <br />Description: <br />Lansing MSU/Spartan PV 1/ Inovateus Solar Array Project — Owner: Spartan PV 1. Develop <br />an approximately 13.8 MW-DC electric power generating facility using solar photovoltaic <br />modules on five (5) parking lots located on the campus. $8,434,889 Year Completed: 2017 <br />Description: <br />Mishawaka Bodine Fish Hatchery — Owner: Indiana Department of Natural Resources. <br />Installation of a small valve and inlet piping replacement on rearing ponds west 1, 2, 7 and 8 and <br />east 2 and 7 ponds. $115,135 Year Completed: 2016 <br />Description: <br />Middlebury 2016 WTP Backwash Pump Station — Owner: Town of Middlebury. Installation <br />of new backwash holding tank influent lift station, various modifications to the existing <br />backwash holding tank effluent pump station; installation of a new control panel to service both <br />the existing backwash effluent pump station and new backwash influent lift station. $363,165 <br />Year Completed: 2017 1 <br />Description: <br />New Carlisle Development Area I Sanitary and Water Improvements — Owner: St. Joseph <br />County Board of Commissioners. Installation of approximately 14,000 linear feet of 16" and 12" <br />water main extension and 12,000 linear feet Sanitary Sewer Extensions, 15"-30" along Walnut <br />Rd., Smilax Rd., and US 20. Install new Water Main & Sanitary Sewer includes: approximately <br />1, 100 feet of trenchless installation under railroad crossing and US 20, Roadway reconstruction, <br />construction of a water pressure reducing valve vault, installation of approximately 20,000 linear <br />feet fiber optic conduit and hand -holds, and other work. $4,655,327 Year Completed: 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.