Laserfiche WebLink
SELGE CONSTRUCTION CO., INC. <br />COMPLETED PROJECT DESCRIPTIONS <br />Description: <br />Mishawaka Bodine Valve #2 Replacement — Owner: Indiana Department of Natural <br />Resources. Remove asphalt surface, install 10 each 4" gate valves with boxes & 4" SCH 80 PVC <br />riser pipes, Install 10" SCH 80 PVC between tanks #5 & #6 on east & west ponds, excavate & <br />replace yard hydrant, backfill full depth trench, restore surface areas with 6" concrete pavement. <br />$115,135 Year Completed: 2017 <br />Description: <br />New Buffalo Lighthouse Creek Drain #298 — Owner: Berrien County Drain Commission. <br />Open channel cleano'ut/channel clearing and shaping, plain & heavy slope & scour protection, <br />boulder revetment, ledge Stone access Stairs, 12" ductile water main, 10" sanitary sewer main <br />replacement, 16' RCP box culvert & wingwall/headwall. $1,273,288 Year Completed: 2017 <br />Description: <br />South Bend Western Avenue Corridor Improvements — Owner: City of South Bend Board of <br />Public Works. Construction of a streetscape project including earthwork, pavement milling, <br />concrete overlay, concrete pavement, asphalt pavement, permeable pavers, concrete curb, and <br />sidewalks, landscaping, storm sewer, lighting, and pavement markings and other appurtenant <br />work. $2,860,242 Year Completed: 2017 <br />Description: <br />Elkhart CR26 Biopad Force Main — Owner: City of Elkhart Board of Public Works. Install <br />approximately 974 feet of 4" HDPE Force Main and restoration along County road 26. $62,785 <br />Year Completed: 2017 <br />Description: <br />Mishawaka Linden Area LTCP Division A Phase II — Owner: City of Mishawaka Board of <br />Public Works. Repair damaged section of sanitary sewer, CIPP lining in Brykit Ave, install <br />storm sewer, manhole rehabilitation and sanitary laterals. $981,453 Year Completed: 2017 <br />Description: <br />Niles 2017 Water main Replacement Sassafras Ln Section A — Owner: City of Niles. <br />Installation of a PC 3 50 DI/C900 PVC water main, multiple. connections to existing water mains, <br />reconnection of existing water services, install valves & hydrants, relocate existing storm and <br />sanitary sewers, disinfection and pressure testing of water main, landscape and pavement <br />restoration. $319,218 Year Completed: 2017 <br />Description: <br />Cassopolis Wastewater Collection System Improvements — Owner: Village of Cassopolis. <br />Lift Station #3, Spencer St Lift Station, Second St Lift Station, Sherman Ln Lift Station, Depot <br />St Lift Station, Reed St. Lift Station, Rowland St Lift Station Rehabilitations and Grinder Station <br />