Laserfiche WebLink
South Bend Redevelopment Commission <br /> Regular Meeting—May 31, 2012 <br /> 6. NEW BUSINESS (CONT.) <br /> A. South Bend Central Development Area <br /> (3) continued... <br /> entire structure has been remediated to allow <br /> for future occupancy. <br /> The exterior improvements consist of <br /> aesthetic and functional project components. <br /> To meet current code, all of the windows <br /> along the alley or east side of the building <br /> needed to be blocked in to meet code for <br /> building spacing. All of the remaining <br /> windows on the second floor were covered <br /> over or modified to present a uniform <br /> appearance for the south and west faces of <br /> the building. The windows are not being <br /> replaced or filled in because of the <br /> uncertainty about the future reuse of the <br /> second floor space. Additionally, masonry <br /> work is needed to repair a loose section of <br /> the facade and parapet of the building. Once <br /> the exterior work is done, the entire building <br /> will be painted. <br /> The improvements to the interior of the <br /> building were related to demolition and <br /> clean-up of spaces that would no longer be <br /> easily accessible once the clinic space was <br /> established on the first floor. Two doors <br /> were also replaced for security purposes. <br /> Mr. Downes and Ms. Jones joined the <br /> meeting at 9:50 a.m. <br /> The total project budget for all exterior work <br /> to be performed at the site was $432,000 as <br /> approved by the Commission earlier in the <br /> year (Resolution No. 3005). The total scope <br /> of work provided by DJ Construction is <br /> 7 <br />