My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
06-14-12 Packet
>
2 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:04:49 AM
Creation date
6/11/2012 1:17:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —May 31, 2012 <br />6. NEW BUSINESS (CONT.) <br />A. South Bend Central Development Area <br />(3) continued... <br />entire structure has been remediated to allow <br />for future occupancy. <br />The exterior improvements consist of <br />aesthetic and functional project components. <br />To meet current code, all of the windows <br />along the alley or east side of the building <br />needed to be blocked in to meet code for <br />building spacing. All of the remaining <br />windows on the second floor were covered <br />over or modified to present a uniform <br />appearance for the south and west faces of <br />the building. The windows are not being <br />replaced or filled in because of the <br />uncertainty about the future reuse of the <br />second floor space. Additionally, masonry <br />work is needed to repair a loose section of <br />the fagade and parapet of the building. Once <br />the exterior work is done, the entire building <br />will be painted. <br />The improvements to the interior of the <br />building were related to demolition and <br />clean -up of spaces that would no longer be <br />easily accessible once the clinic space was <br />established on the first floor. Two doors <br />were also replaced for security purposes. <br />Mr. Downes and Ms. Jones joined the <br />meeting at 9:50 a.m. <br />The total project budget for all exterior work <br />to be performed at the site was $432,000 as <br />approved by the Commission earlier in the <br />year (Resolution No. 3005). The total scope <br />of work provided by DJ Construction is <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.