Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting —May 31, 2012 <br />6. NEW BUSINESS (CONT.) <br />A. South Bend Central Development Area <br />(3) continued... <br />entire structure has been remediated to allow <br />for future occupancy. <br />The exterior improvements consist of <br />aesthetic and functional project components. <br />To meet current code, all of the windows <br />along the alley or east side of the building <br />needed to be blocked in to meet code for <br />building spacing. All of the remaining <br />windows on the second floor were covered <br />over or modified to present a uniform <br />appearance for the south and west faces of <br />the building. The windows are not being <br />replaced or filled in because of the <br />uncertainty about the future reuse of the <br />second floor space. Additionally, masonry <br />work is needed to repair a loose section of <br />the fagade and parapet of the building. Once <br />the exterior work is done, the entire building <br />will be painted. <br />The improvements to the interior of the <br />building were related to demolition and <br />clean -up of spaces that would no longer be <br />easily accessible once the clinic space was <br />established on the first floor. Two doors <br />were also replaced for security purposes. <br />Mr. Downes and Ms. Jones joined the <br />meeting at 9:50 a.m. <br />The total project budget for all exterior work <br />to be performed at the site was $432,000 as <br />approved by the Commission earlier in the <br />year (Resolution No. 3005). The total scope <br />of work provided by DJ Construction is <br />7 <br />