Laserfiche WebLink
ALTERNATE #16b — INSTALL NEW 9'6 "X12'10" O.H. DOOR (continued) <br />transmission. Patented water channel is provided for a drip free opening. The <br />polyurethane foam insulation is fully encapsulated in non - permeable materials for no <br />loss of thermal efficiency. Limited 10 -year warranty against panel delamination of foam <br />and steel skins. <br />Alternate #16b Add: $2,750.00 <br />ALTERNATE #17 — PAINT NORTH ADDITION OF BUILDING <br />Paint the remainder of the overall building (the North addition) not included in <br />Alternate #8 above. This includes painting over the window glass above the car wash <br />addition facing the alley. <br />Alternate #17 Add: $9,500.00 <br />ALTERNATE #18 — NOT SELECTED <br />ALTERNATE #19 — NOT SELECTED <br />ALTERNATE #20 — REPAIR BRICK PARAPET ALONG THE ALLEY <br />On Thursday 4/5/2012 the overhead power lines were shut off by AEP and we started <br />scraping the loose paint and brick on the east wall of the building in preparation for <br />painting. The top 9 courses of brick are in a considerable state of disrepair. After much <br />discussion and evaluation, it is my opinion that the brick used at the parapet on the alley <br />side are softer than those used on the other faces and they tend to absorb water more. <br />This has resulted in the faces of many brick spalling off and significant deterioration of <br />the mortar joints. While we do not feel this location justifies the expense of replacing <br />the damaged brick and tuck pointing the mortar joints, we do have considerable <br />concern about how well the new paint will adhere to this area and how long it will hold <br />up. We propose to improve the face of the parapet by the following method: The area <br />to be treated is the top 2' of brick by 176' long. Power wash with rotary tip to remove <br />all the loose particles. Pre -wet wall with Tammsweld liquid bonding agent. In -fill <br />mortar joints and missing brick faces with Tamms Thin Patch polymer- modified, cement <br />based mortar formulated for repairing defects in concrete and masonry surfaces from <br />featheredge up to 1 ". This will result in a relatively smooth surface (similar in <br />appearance to the cast -in -place concrete beam directly below the brick parapet) that <br />will encapsulate the existing brick and mortar joints into a significantly more stable <br />surface for the paint to adhere to. This should prevent or minimize future spalling of <br />brick as long as the back side of the parapet is properly flashed to the roof of the <br />building. <br />Alternate #20 Add: $5,400.00 <br />ALTERNATE #21— COVER GLAZING AT WEST WALL WITH METAL PANELS <br />Provide and install seven pieces of 13 gauge steel metal panels to cover the damaged <br />glass at the H.M. frames of the former auto parts entrance, prior to painting Alt. #17. <br />Alternate #21 Add: $1,150.00 <br />ALTERNATE #22 — NOT SELECTED <br />DJ Construction Co., Inc. City of South Bend & ACS — VA Clinic — Gates Building 5/3/2012 Page 7 <br />