Laserfiche WebLink
Interior Work <br />Gates Building Improvements - DJ Construction <br />1 <br />Paint Booth Removal <br />2,800.00 <br />2 <br />Remove Heating Unit <br />600.00 <br />3 <br />Demolish 3 Bays of Ramp <br />14,575.00 <br />3X <br />Reserved <br />0.00 <br />4 <br />Cleanup Second Floor <br />2,000.00 <br />5 <br />Fill in 2nd Floor Windows with Block <br />18,890.00 <br />6 <br />Fill in 2nd Floor Windows with Metal <br />32,500.00 <br />7 <br />Reserved <br />0.00 <br />8 <br />Paint three sides of building <br />25,060.00 <br />9 <br />Asbestos and other abatement - Main Floor <br />17,750.00 <br />10 <br />Asbestos and other abatement - Second <br />8,900.00 <br />11 <br />Asbestos and other abatement - Boiler Room <br />10,850.00 <br />12 <br />Demolish and Remove Raised Platform <br />1,125.00 <br />13 <br />Repair Cracks in Brick above Entrance <br />500.00 <br />14 <br />Repair Cracks in NW corner of building <br />750.00 <br />15 <br />Install new door at SE Stairwell <br />1,600.00 <br />16B <br />Install new overhead door at alley <br />2,750.00 <br />17 <br />Paint north addition of building <br />9,500.00 <br />18 <br />Reserved <br />0.00 <br />19 <br />Reserved <br />0.00 <br />20 <br />Repair brick parapet along the alley <br />5,400.00 <br />21 <br />Cover windows at west wall with metal panels <br />1,150.00 <br />22 <br />Paint Schillings Building - Rejected price <br />0.00 <br />TOTAL <br />156,700.00 156,700.00 <br />Interior Work <br />17,750.00 <br />1 <br />Paint Booth Removal <br />2,800.00 <br />2 <br />Remove Heating Unit <br />600.00 <br />3 <br />Demolish 3 Bays of Ramp <br />14,575.00 <br />4 <br />Cleanup Second Floor <br />2,000.00 <br />5 <br />Fill in 2nd Floor Windows with Block <br />18,890.00 <br />15 <br />Install new door at SE Stairwell <br />1,600.00 <br />16B <br />Install new overhead door at alley <br />2,750.00 43,215.00 <br />Exterior Work <br />17,750.00 <br />6 <br />Cover 2nd Floor Windows with Metal <br />32,500.00 <br />.8 <br />Paint three sides of building <br />25,060.00 <br />13 <br />Repair Cracks in Brick above Entrance <br />500.00 <br />14 <br />Repair Cracks in NW corner of building <br />750.00 <br />17 <br />Paint north addition of building <br />9,500.00 <br />20 <br />Repair brick parapet along the alley <br />5,400.00 <br />21 <br />Cover windows at west wall with metal panels <br />1,150.00 74,860.00 <br />Asbestos and Environmental Remediation <br />9 Asbestos and other abatement - Main Floor <br />17,750.00 <br />10 Asbestos and other abatement - Second <br />8,900.00 <br />11 Asbestos and other abatement - Boiler Room <br />10,850.00 <br />12 Demolish and Remove Raised Platform <br />1,125.00 38,625.00 <br />156, 700.00 1 <br />