Laserfiche WebLink
7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner four 4 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within fourteen_CL41 calendar days after receipt of Owner's <br />comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, character, <br />or design requirements of or for the Project, and upon written authorization from Owner, Engineer <br />shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. Product specifications or "basis -of - <br />design" will be included in the drawings. <br />2. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />Updates to sheets listed out in preliminaLl desi n hase <br />Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within <br />fourteen 14 days of receipt, Owner shall submit to Engineer any comments and, subject to <br />the provisions of Paragraph 6.0l .G, instructions for revisions. <br />Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit fours final copies of the bidding documents, a revised <br />opinion of probable Construction Cost, and any other deliverables to Owner within <br />fourteen_CL4Z calendar days after receipt of Owner's comments and instructions. <br />B. Engineer's services under the Final Design Phase will be considered complete on the date when the <br />submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500Agreenent Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineersfor EJCDC. All rightsreaerved. <br />