Laserfiche WebLink
7. Revise the Report and any other deliverables in response to Owner's comments, as <br />appropriate, and furnish fours copies of the revised Report and any other deliverables to <br />the Owner within fourteen 14 calendar days of receipt of Owner's comments. <br />B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. Product <br />specifications or "basis -of -design" will be included in the drawings. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. Owner shall <br />provide all existing mechanical, electrical and plumbing drawings to coordinate renovation <br />of restrooms, locker rooms or break areas containing fixtures. <br />Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />Cover sheet encral symbols/notes, demolitionplan(s) to include any partitions, doors <br />and/or millwork to be removed and relocated or demolished con2pletely. Floor plans shall <br />include the location of any new or relocated partitions doors & millwork. Deflected <br />Ceiling, Plan shall include a general la out of the existing ceilings to remain or be <br />refinished. Intent is for all mechanical dilibsem louvers and lighting, audio/visual sprinkle <br />piping and/or Dlumbing fixtures to remain and onl be re laced on an "as needed" basis. <br />Finish es Plan will include all new wall base floor and ceiling finishes to be provided in <br />the identified she. <br />6. Furnish fours review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within thirty_(101 calendar days of authorization to proceed with this <br />phase, and review them with Owner. Within 1'trurteen (14) calendar days of receipt, Owner <br />shall submit to Engineer any comments regarding the Preliminary Design Phase documents <br />and any other deliverables. <br />Page 2 <br />(Exhibit A —Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Sod ety of Professions] Engineersfor EJCDC. All rights reserved. <br />