My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Controller Consolidation Agreement - Network Solutions Inc - Consolidation of Wi-Fi
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Controller Consolidation Agreement - Network Solutions Inc - Consolidation of Wi-Fi
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:43:56 AM
Creation date
11/28/2018 10:23:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
letworkSolutions <br />• Tasks not listed in this document will require a char a order. Please reguest a review if inecessary items have not <br />been covered with in this Scope of "litl/ork. <br />Design Specifications and Assumptions <br />• Assumption 1— a 4-Post rack is necessary for the installation of the 5520 series controllers. It is assumed that this <br />exists as the proper installation of a 5508-series controller (current model in place) also uses a 4-Post rack. <br />• Assumption 2 — CoSB will coordinate the movement of the new ISP handoff into the Data Center that will house the <br />new MX-Firewall for the Public-Wifi connection. This should be at the same location of the current/new wireless <br />controllers as well. <br />• Assumption 3 — No work with the existing Prime server is included in this project. NSI has not had any involvement <br />with the Prime deployment in this environment, and further details would be needed on the system. An upgrade or <br />redeployment of the Prime Infrastructure may be required to be able to work with the newer controllers that are <br />being offered. This should be further review and handle through a separate project — Prime Infrastructure is a <br />management platform and will not have an impact on performance or operation of the wireless system. <br />• Assumption 4—The DTSB VLANs and IP address ranges that are deployed in the City network are available to be <br />migrated into the current CoSB network. The change of VLANs or IP addresses on the existing DTSB equipment is <br />outside the scope of this project. A change order would be needed to redesign and reconfigure these switches <br />throughout the city. <br />• Assumption 5 —The licenses quantity in this quote is subject to change. Wireless licenses may be added from the <br />time these quantities were quoted. If additional licenses are required at the time of installation a change order will <br />be necessary to support the total number of access points. <br />• Assumption 6 — This design assumes that there is either 4 x 1G or 4 x 10G SFP Uplink ports available in the hardware <br />that the new controllers will be connected to. If additional parts or an exchange of parts are required a change order <br />will be made. <br />• Assumption 7 — The Century Center VLANs will have been integrated into the CoSB network prior to this project so <br />that necessary VLANs/Networks will be accessible as necessary for the wireless migration to take place. <br />Implementation <br />Network Solution Inc. views the successful completion of this project as a partnership between themselves and City <br />of South Bend. The following section provides the scope of work each is responsible for throughout different <br />phases of this project. <br />Pr aration / Provisioning Retie crnaibiliti <br />Network -Wide <br />• NSI will conduct an internal kickoff meeting to review the purpose of the project, desired business outcomes, <br />proposed design, statement of work, stakeholders, equipment, team member requirements, and base scheduling. <br />• NSI will conduct an external kickoff meeting with CoSB to verify the purpose of the project, desired business <br />outcomes, proposed design, statement of work, stakeholders, equipment ordered, equipment delivery timelines, <br />and installation dates and timelines. <br />• NSI will provide a project plan outlining the expected steps needed to accomplish the installation successfully with <br />minimum interruption. <br />Wireless <br />• NSI will perform a walkthrough of each facility providing a best -effort verification of building layout, building <br />www.nsil.com WHY we do is as important as WHAT we do (574) 271-09.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.