Laserfiche WebLink
Ms. Ann Kolata <br />May 4, 2012 <br />S131068.400.0001 <br />Page 5 <br />analyzed for VOCs in accordance with U.S. EPA Method 8260; <br />5. collection of more than 60 groundwater samples (including QA/QC samples) to <br />be analyzed for VOCs in accordance with U.S. EPA Method 8260; <br />6. disposal of groundwater that is determined to be hazardous; and <br />7. communication with regulatory agencies regarding the Site. <br />No amendment to this proposal shall be required in situations where additional work may be <br />necessary, as a result of unanticipated or unidentified conditions including, but not limited to, the <br />presence of unidentified or mislocated buried utilities, structures, or objects and unanticipated <br />hazardous materials and /or hazardous or dangerous circumstances, to complete previously <br />identified tasks. Hull shall be compensated for the actual time spent performing this additional <br />work and other direct expenses and subcontractor fees at the billing rates outlined in Table 2. <br />STANDARD OF CARE AND LIMITATIONS <br />Hull shall perform its services using that degree of care and skill ordinarily exercised under <br />similar conditions by reputable members of its profession practicing in the same or similar <br />locality at the time of service. No other warranty, expressed or implied, is made or intended by <br />our proposal or by our oral or written reports. The work will not attempt to evaluate past or <br />present compliance with federal, state, or local environmental or land use laws or regulations. <br />Conclusions presented by Hull regarding the Site to be investigated shall be consistent with the <br />Scope of Work, level of effort specified, and investigative techniques employed. Reports, <br />opinions, letters and other documents will not evaluate the presence or absence of any <br />compound or parameter not specifically analyzed and reported. The presence of radiation, <br />radon, lead, electromagnetic fields, and indoor air pollution will not be investigated, unless <br />specifically stated in the scope of work. Hull makes no guarantees regarding the completeness <br />or accuracy of any information obtained from public or private files or information provided by <br />subcontractors. <br />Again, thank you for the opportunity to conduct additional Phase II ESA activities at Ignition <br />Park. Please call me at (800) 241 -7173 if you have any questions. If you approve of this <br />proposal, please sign the attached Task Order form and return it to my attention. <br />Sincerely, <br />Douglas G. Stuart, CHMM <br />Senior Project Manager <br />ct: File <br />