V. Sections A.1 & 2 of Appendix "D" is modified as follows:
<br />A. Amount of Payment
<br />1. The ENGINEER shall receive as payment for the work performed under
<br />this Agreement the total fee not to exceed of $1,149,660 $1,132,205.00
<br />unless a modification of agreement is approved in writing by the OWNER.
<br />2. The ENGINEER will be paid for the work performed under Appendix "A" of
<br />this Agreement on a Lump Sum basis in accordance with the following
<br />schedule, except as noted in the items below:
<br />3 of 6
<br />Supplemental Agreement No. 1
<br />Description - Phase 1 Design and Right of Way Engineering
<br />Amount
<br />a.
<br />Field Survey, Including Location Control Route Survey Plat
<br />$115,000.00
<br />b.
<br />Roadway Design and Plans, Phase 1
<br />$220,000.00
<br />c.
<br />15% Concept Design of Pine Road Connector intersection w/ US 20
<br />$3,000.00
<br />d.
<br />Li htin Design and Plans, Phase 1
<br />$19,000.00
<br />e.
<br />Utility Coordination
<br />$5,000.00
<br />f.
<br />Erosion Control Plans and Notice of Intent Letter
<br />$4,000.00
<br />g.
<br />INDOT Cut Road Permit & Coordination, Hourly Rate
<br />$2,500.00
<br />h.
<br />Title Insurance and Updates, as required 17 Parcels
<br />$5,525.00
<br />i.
<br />R/W Engineering 17 Parcels @ $2,250 Each
<br />$38,250.00
<br />R/W Coordination, HourIv Rate
<br />$19,195.00
<br />k.
<br />R/W Staking, Hourly Rate, as required 32 Parcels @ $650 Each
<br />$20,800.00
<br />I.
<br />R/W Dedication Plat
<br />$12,000.00
<br />m.
<br />Public Information Meeting, Hourly Rate
<br />$2,585.00
<br />Subtotal, Phase 1 Design and Right of Way En ineerin
<br />$466,855.00
<br />3 of 6
<br />Supplemental Agreement No. 1
<br />Description - Phase 1 Right of Way Buying, Bidding and Construction
<br />Amount
<br />q1.
<br />Phase Services
<br />$62,000.00
<br />n.
<br />Appraising, Right of Way Management & Buying Services (1st & 2nd Appraisals) (34
<br />$224,000.00
<br />q3-
<br />Appraisals @ $2,000 Each, 17 Buying Parcels @ $3,000 Each, Right of Way
<br />$29,000.00
<br />H.
<br />Management — 17 Each
<br />$10,000.00
<br />o.
<br />Bid Phase Services, Hourly Rate
<br />$3,000.00
<br />p.
<br />Pre - Construction Conference, Hourly Rate
<br />$1,500.00
<br />Construction Phase Office Services, Hourly Rate
<br />$6,000.00
<br />Subtotal, Phase 1 Right of Way Buying, Bidding and Construction
<br />$234,500.00
<br />Phase Services
<br />3 of 6
<br />Supplemental Agreement No. 1
<br />Description - Phase 2 30% Design Plans and Right of Way
<br />Engineering
<br />Amount
<br />q1.
<br />Roadway 30% Design and Plans, Phase 2
<br />$62,000.00
<br />q2-
<br />Title Insurance and Updates, as required 10 Parcels @ $325 Each
<br />$3,250.00
<br />q3-
<br />RNV Engineering 10 Parcels @ $2,900 Each
<br />$29,000.00
<br />H.
<br />Pick-up Field Survey
<br />$10,000.00
<br />Subtotal, Phase 2 30% Design and Right of Way Engineering
<br />$104,250.00
<br />3 of 6