Laserfiche WebLink
V. Sections A.1 & 2 of Appendix "D" is modified as follows: <br />A. Amount of Payment <br />1. The ENGINEER shall receive as payment for the work performed under <br />this Agreement the total fee not to exceed of $1,149,660 $1,132,205.00 <br />unless a modification of agreement is approved in writing by the OWNER. <br />2. The ENGINEER will be paid for the work performed under Appendix "A" of <br />this Agreement on a Lump Sum basis in accordance with the following <br />schedule, except as noted in the items below: <br />3 of 6 <br />Supplemental Agreement No. 1 <br />Description - Phase 1 Design and Right of Way Engineering <br />Amount <br />a. <br />Field Survey, Including Location Control Route Survey Plat <br />$115,000.00 <br />b. <br />Roadway Design and Plans, Phase 1 <br />$220,000.00 <br />c. <br />15% Concept Design of Pine Road Connector intersection w/ US 20 <br />$3,000.00 <br />d. <br />Li htin Design and Plans, Phase 1 <br />$19,000.00 <br />e. <br />Utility Coordination <br />$5,000.00 <br />f. <br />Erosion Control Plans and Notice of Intent Letter <br />$4,000.00 <br />g. <br />INDOT Cut Road Permit & Coordination, Hourly Rate <br />$2,500.00 <br />h. <br />Title Insurance and Updates, as required 17 Parcels <br />$5,525.00 <br />i. <br />R/W Engineering 17 Parcels @ $2,250 Each <br />$38,250.00 <br />R/W Coordination, HourIv Rate <br />$19,195.00 <br />k. <br />R/W Staking, Hourly Rate, as required 32 Parcels @ $650 Each <br />$20,800.00 <br />I. <br />R/W Dedication Plat <br />$12,000.00 <br />m. <br />Public Information Meeting, Hourly Rate <br />$2,585.00 <br />Subtotal, Phase 1 Design and Right of Way En ineerin <br />$466,855.00 <br />3 of 6 <br />Supplemental Agreement No. 1 <br />Description - Phase 1 Right of Way Buying, Bidding and Construction <br />Amount <br />q1. <br />Phase Services <br />$62,000.00 <br />n. <br />Appraising, Right of Way Management & Buying Services (1st & 2nd Appraisals) (34 <br />$224,000.00 <br />q3- <br />Appraisals @ $2,000 Each, 17 Buying Parcels @ $3,000 Each, Right of Way <br />$29,000.00 <br />H. <br />Management — 17 Each <br />$10,000.00 <br />o. <br />Bid Phase Services, Hourly Rate <br />$3,000.00 <br />p. <br />Pre - Construction Conference, Hourly Rate <br />$1,500.00 <br />Construction Phase Office Services, Hourly Rate <br />$6,000.00 <br />Subtotal, Phase 1 Right of Way Buying, Bidding and Construction <br />$234,500.00 <br />Phase Services <br />3 of 6 <br />Supplemental Agreement No. 1 <br />Description - Phase 2 30% Design Plans and Right of Way <br />Engineering <br />Amount <br />q1. <br />Roadway 30% Design and Plans, Phase 2 <br />$62,000.00 <br />q2- <br />Title Insurance and Updates, as required 10 Parcels @ $325 Each <br />$3,250.00 <br />q3- <br />RNV Engineering 10 Parcels @ $2,900 Each <br />$29,000.00 <br />H. <br />Pick-up Field Survey <br />$10,000.00 <br />Subtotal, Phase 2 30% Design and Right of Way Engineering <br />$104,250.00 <br />3 of 6 <br />Supplemental Agreement No. 1 <br />