Laserfiche WebLink
REGULAR MEETING <br />MARCH 27 2012 107 <br />Segment <br />. Company <br />Description <br />Method <br />Cost <br />2 <br />IKON* <br />MP2352sp <br />Purchase <br />$2,406.00 <br />4 <br />IKON <br />MP3352s <br />Lease <br />$2,339.76 <br />6 <br />VanAusdall ** <br />MP6001sp <br />Lease <br />$4,300.80 <br />7 <br />IKON <br />MP7001 sp <br />Lease <br />$5,109.24 <br />* Advanced imaging Solutions quoted lower cost Model that did not meet specification <br />* * IKON quoted lower cost model that did not meet specification <br />It was noted that Advanced Imaging quoted a lower cost for Segment 2 but did not meet the <br />specification and IKON quoted a lower cost model for Segment 7 that did not meet the <br />specifications. Therefore, Mr. Gilot made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />AWARD QUOTATION — MULTI SEGMENT_ _ _ COLOR MFP COPY MACHINES <br />(DEPARTMENT OPERATING FUNDS) <br />Mr. Phil Custard, Purchasing, advised the Board that on March 13, 2012, quotations were <br />received and opened for the above referenced copiers for purchase or lease through individual <br />departments. After reviewing those quotations, Mr. Custard recommended that the Board award <br />the contract to the lowest responsive and resnon.sible h ddf-.ra- <br />Segment <br />Company <br />Description <br />Method <br />Cost <br />2 <br />IKON <br />MPC2051 <br />Purchase <br />$2,429.00 <br />3 <br />US Business <br />LD630C <br />Lease <br />$2,414.64 <br />4 <br />IKON <br />MPC4501 <br />Lease <br />$3,808.80 <br />5 <br />IKON* <br />MPC7501 <br />Lease <br />$6,092.56 <br />* US Business System quoted an alternate model that did not meet specification <br />It was noted that US Business System quoted an alternate model for Segment 5 that did not meet <br />the specifications. Therefore, Mr. Gilot made a motion that the recommendation be accepted and <br />the quotation be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />REJECT QUOTATIONS — WATER WORKS PAPER PRODUCTS 2012 WATER WORKS <br />OPS) <br />Ms, Nancy Yarbrough, Water Works, advised the Board that on March 13, 2012, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Ms. Yarbrough recommended that the Board reject all quotes as non - responsive because none of <br />the quotes included samples of the products, as required by the specifications. Therefore, Mr. <br />Inks made a motion that the recommendation be accepted and all quotes be rejected as non- <br />responsive. Mr. Gilot seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 2 — RIVER COMMONS LIFT STATION <br />REPLACEMENT —PROJECT NO. 109 -087B 2010 SEWER BOND <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 2 on behalf <br />of Niblock Excavating, Inc., 906 Maple Street, PO Box 211, Bristol, Indiana 46507, indicating <br />the contract amount be increased by $22,000.00 for a modified contract sum, including this <br />Change Order, in the amount of $274,965.60. Upon a motion made by Mr. Inks, seconded by <br />Mr. Gilot and carried, the Change Order was approved. <br />TABLE CHANGE ORDER NO. 3 FINAL — STUDEBAKER CORRIDOR AREA A <br />DEMOLITION PHASE IV — PROJECT NO. 109 -032 AEDA TIF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 (Final) on <br />behalf of Dore and Associates Contracting, Inc., 900 Truman Parkway, Bay City, Michigan <br />48706, indicating the contract amount be decreased by $1,161,844.52 for a modified contract <br />sum, including this Change Order, in the amount of $4,897,093.11. Linda Martin, Clerk, stated <br />she has been asked to table this request until further notice. Upon a motion made by Mr. Inks, <br />seconded by Mr. Gilot and carried, the Change Order was tabled. <br />