My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - WBK Engineering LLC - Design Services for VPA Athletic Court Renovations
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - WBK Engineering LLC - Design Services for VPA Athletic Court Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:56:20 AM
Creation date
11/14/2018 1:17:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF SERVICES <br />Task 1: Hardcourt Study and Assessment Report <br />Kick-off Meetin with City of South Bend Engineering and VPA staff. This meeting will be held in <br />conjunction with the field Conditions assessment <br />Field Conditions Assessment, with COSB Engineering/VPA staff-14 venues. The assessment includes <br />reviewing 14 outdoor hardcourt facilities for issues related to subsurface drainage, surface ponding, free <br />pavement thickness and condition, base conditions, if known, and other factors affecting the playing <br />surface including moisture retention, vegetation management, debris accumulation impacts on surface <br />detrioation, etc. Recommendations for improvements to surface and subsurface drainage conditions, <br />freeze -thaw conditions, subgrade conditions, edge management, pavement section, and related <br />management issues will be provided. <br />Recommendations for pavement cores, where necessary at select sites will be provided. Geotechnical <br />scope by others, as necessary. WBK recommends a budget of $5,000 for this work. It is included as an <br />alternate allowance in our scope of services. <br />Pre are Draft Conditions Assessment Report for each of the 14 hardcourt locations including <br />recommendations for surface grade modifications, subgrade enhancement through drainage and <br />replacement of stone pavement, repair or replacement pavement and options for pavement surfaces. <br />Engineer's Estimate of Probable Cost for each hardcourt location. <br />Finalize Conditions Assessment Report by addressing comments provided by COSB Engineering/VPA <br />staff. <br />Task 2: Preliminary Engineering Plans for Hardcourt Renovations <br />Pavement Core Review. We will review a geotechnical pavement core investigation (provided by others).. <br />The cost to complete a geotechnical investigation is not included in our costs, but we will obtain <br />proposals, if requested, and review them with you. The contractual obligations for any geotechnical <br />investigations will be between you and the Geotechnical Consultant. <br />Preiirninar orwge wi P'ia preparation at a scale of approximately 1"=30'. The plan will show cursory <br />grading information, utilities, storm sewer, and surface and subsurface (tile) drainage information. <br />Prehmiinary 0 inion of Probabie Construction Costwill be prepared based upon the information contained in <br />the preliminary design documents. <br />!Consultation. We have budgeted attending up to two (2) meetings with the City staff to determine the <br />standards to be used in the design as well as the adequacy of existing infrastructure that serves the <br />facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.