My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Howard Park Redevelopment & St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - Howard Park Redevelopment & St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:39:03 PM
Creation date
11/14/2018 12:33:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No.1 <br />Howard Park Redevelopment <br />Project No. 117-047-B <br />18. Substitute Swingset- 4 Arch Belts Seats and 1 Arch Friendship <br />Swing (Rather Than 2 Oodle Swings and 1 Friendship Swing) - <br />See Sheets L1.7, L1.8, L1.9, L1.10, L1.11, swingset image <br />attached ...Deduct Eleven Thousand Five Hundred Thirty -Nine <br />Dollars ($11,539.00) from the Contract Amount. <br />19. Reduce Length of Rope Pulls at Playground - Elevation <br />Change - See Sheets L1.7, L1.8, L1.9, L1.10, L1.11; (Reference <br />Specification Section 1168 00 Play Equipment - Replace rope <br />pulls and related components with proposed reduced length <br />option to 6'(3 locations) ...Deduct Four Thousand Three <br />Hundred Sixty -Eight Dollars ($4,368.00) from the Contract <br />Amount. <br />20. Spinner Spinner - Topsy Turvey Spinner in place of Global <br />Motion - See Sheets L1.7, L1.8, L1.9, L1.10, L1.11, spinner <br />image attached (Reference Specification Sectionll 68 00 Play <br />Equipment) ...Deduct Twenty -Five Thousand Nine Hundred <br />Twelve Dollars ($25,912.00) from the Contract Amount. <br />21. Change to Manual Window Shades in Community Center <br />Rooms, Event Space Room No.122 and Event Space Room <br />No.124, in lieu of Motorized Window Shades as shown and <br />specified (Reference Sheet A6.4 Interior Elevations and <br />Specification Section 12 24 00 Window Shades) ...Deduct Four <br />Thousand Dollars ($4,000.00) from the Contract Sum. <br />23. Delete Stainless Steel Handrail from the Scope of Work <br />(Reference Drawing Sheets R5.5) ...Deduct Eighty -Five <br />Thousand Dollars ($85,000.00) from the Contract Amount. <br />24. Change to Motor Control Panel (MCP) in lieu of Motor <br />Control Center (Reference Specification Section 13 18 15.06 <br />Ice System Electrical and Specification Section 13 24 19 Motor <br />Control - Fountain); MCP shall include both power needs and <br />system protection specified and all refrigeration system <br />controls specified. Motor starters may either be included in <br />the panel or installed adjacent the related equipment -provide <br />access and clearances as required by Code. Panel shall meet <br />all required Codes. Portable computer controls for the system <br />shall be located on a permanent shelf/table. MCP <br />supplier/installer shall coordinate with Contractor. ...Deduct <br />Forty Thousand Dollars ($40,000.00) from the Contract. <br />SHEET 5 OF 10 <br />Deduct $11,539.00 <br />Deduct $4,368.00 <br />Deduct $25,912.00 <br />Deduct $4,000.00 <br />Deduct $85,000.00 <br />Deduct $40,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.