Laserfiche WebLink
Change Order No.1 <br />Howard Park Redevelopment <br />Project No. 117-047-B <br />13. Delete Wall Covering (WC-1) from the Scope of Work Deduct $20,000.00 <br />(Reference Addendum No. 3, Paragraph IV Drawings, Sub - <br />Paragraph B. Sheet A9.1 Room Finish Schedule and Addendum <br />No. 4, Drawings Sheet A6.3A Interior Elevation... Deduct <br />Twenty Thousand Dollars ($20,000.00) from the Contract <br />Amount. <br />14. Delete Painted Ceilings in Support Facility Mechanical and Deduct $9,000.00 <br />Storage Rooms, including Room No. B101 Custodian, Room <br />No. B102 Ice Equipment, Room No. B103 M/E, Room No. <br />B104 Zamboni, and Room No. B105 Maintenance — See <br />Sheets A1.4 and A9.1 attached (Reference Addendum No. 2 - <br />Sheet A1.4 Reflected Ceiling Plan, Revision No. 1 and Sheet <br />A9.1 Support Building Room Finish Schedule) ...Deduct Nine <br />Thousand Dollars ($9,000.00) from the Contract Amount. <br />15. Change Acoustical Ceiling Tile ACT-1 to USG Mars #86985 Deduct $3,470.00 <br />with standard 9/16" Centricitee DXT, in lieu of Armstrong <br />Tile and Suspension System Products (Reference Specification <br />Section 09 5100 Acoustical Ceilings, Paragraph B. Products); <br />Change Ceiling Tile to ACT-1 in Women's Room No. 118, <br />Family Room No. A119, and Men's Room No. 120 — See <br />Sheets A1.3 and A9.1 attached, in lieu of ACT-4 as shown on <br />drawings (Reference Sheet A1.3 Reflected Ceiling Plan and <br />Sheet A9.1 Room Finish Schedule ...Deduct Three Thousand <br />Four Hundred Seventy Dollars ($3,470.00) from the contract <br />Amount. <br />16. Delete Acoustical Ceiling ACT-2 in Community Center Storage Deduct $1,020.00 <br />Room No. 125 — See Sheets A1.3 and A9.1 attached <br />(Reference Sheet A1.3 Reflected Ceiling Plan and Sheet A9.1 <br />Room Finish Schedule) ...Deduct One Thousand Twenty <br />Dollars ($1,020.00) from the Contract Amount. <br />17. Manufacturer's Discount of Luxury Vinyl Tile (LVT-1) Deduct $2,100.00 <br />(Reference Specification Section 09 65 00 Resilient Flooring) <br />...Deduct Two Thousand One Hundred Dollars ($2,100.00) <br />from the Contract Amount. <br />SHEET 4 OF 10 <br />