My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Abonmarche Consultants - Survey and Design Work for St Louis Blvd Festival Street
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 2 to PSA - Abonmarche Consultants - Survey and Design Work for St Louis Blvd Festival Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:22:20 AM
Creation date
11/14/2018 12:28:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred <br />to in and part of the Agreement between <br />Owner and Engineer for Professional Services <br />dated July 11, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />The Effective Date of this Amendment is: , { Yf X�:� .2fi18. <br />Background Data <br />Effective Date of Owner -Engineer Agreement: July 11, 2017 <br />Owner: Board of Public Works, City of South Bend, Indiana <br />Engineer: Abonmarche Consultants, Inc. <br />Project: St. Louis Boulevard Festival Street <br />Nature of Amendment: [Check those that are applicable and delete those that are inapplicable.] <br />Additional Services to be performed by Engineer <br />Modifications of payment to Engineer <br />-Az,' Modifications to time(s) for rendering services <br />Description of Modifications: <br />Add additional plan set, bid documents, bid phase and construction administration for Zion <br />Church parking lot to be bid as separate project. Revise parking lot design to accommodate <br />Church requests regarding tree and grades. <br />Combine St. Louis plans and specs with Howard Park plans and specs to bid and <br />construct under one construction contract. <br />Add reverse angle parking design on St. Louis Boulevard. <br />Add survey and design for lower river walk from Howard Park to ND Boathouse. <br />Add survey and design for river wall from Howard Park to ND Boathouse. <br />Add bid process and construction administration for river wall and river walk work from <br />Howard Park to Beyers Street. <br />Exhibit K —Amendment to Owner -Engineer Agreement. <br />EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2014 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.