Laserfiche WebLink
a. General Contractor <br />b. Applicant's development team <br />C. Applicable utility companies as necessary <br />The general purpose of the pre- construction conference is to outline the phasing <br />and responsibilities of key tasks such as: <br />a. Utility connections <br />b. Final grading and drainage construction <br />C. Project driveway and bikepath interface with existing roads and bike <br />paths. <br />d. Fine grading and landscaping. <br />2. Construction sites shall be maintained in a neat and orderly manner. All trash <br />shall be kept in enclosed containers and emptied frequently. <br />3. At the end of the construction period, by phase, the Applicant shall submit to the <br />Committee reproducible copies of record drawings (as- builts) showing the actual <br />locations of all underground utilities and irrigation systems. <br />4. It is the responsibility of the Applicant to protect the area designated as <br />Conservation Easement from all construction processes. This protection should <br />include without limitation, enclosing the area and the area's drip line with a <br />temporary fence and construction of a temporary ditch to prevent runoff from <br />reaching the Conservation area. <br />LANDSCAPING <br />The Landscape Guidelines recognize that landscaping is of primary importance to the <br />establishment of the design character of Blackthorn. The Guidelines are intended to <br />promote the establishment of compatible and continuous landscape development to <br />enhance and unify Blackthorn. More specifically, the guidelines are intended to provide <br />for a neat and well maintained appearance in areas not covered by buildings, parking, <br />or Conservation Easements; to enhance and preserve the existing site character; to <br />minimize the adverse visual and environmental impacts of large paved areas. The <br />landscaping requirements are as follows: <br />10 Blackthorn Corporate Park - Development Guidelines 2123112 draft <br />