My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
03-13-12 Packet
>
6C (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:31:58 AM
Creation date
3/9/2012 1:23:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 22, 2011 <br />City gI'Suuth Bend <br />Proposal %or Gngineering Services <br />Mintz P(trkwm) ,Vz&i -use Path Pub =e I qj'3 <br />APPENDIX "A" <br />Work Plan <br />PROJECT SCOPE <br />The proposed project consists of the design and development of bid documents for the <br />construction of a multi -use path b feet in width from the entrance to Blackthorn Golf Course <br />to the west side of Mayflower Road over a distance of 4,400 feet. A rest area will be <br />developed near the golf course 15 "' tee. <br />This project will require field survey, roadway design and landscape design_ The topographic <br />survey will survey the area from the south and east curb line to the existing right-of-way line in <br />the areas that were not surveyed previously for the Mayflower Sewer Project. Lighting for the <br />path wiI I be designed to mount on the path side of the existing; lic lit poles. <br />SCOPE OF SERVICES <br />The scope of services proposed herein includes the design and development of bid documents <br />for the project and are further described as follows: <br />Task #1: Field Survey <br />(a) Obtain recorded plats, deeds of all adjacent properties, and section line documentation; <br />(b) Obtain utility maps for all of the utilities in the existing right of way; <br />(c) Establish the existing right of ways and set construction control lines. Witness survey <br />horizontal control points; <br />(d) Run benchmark levels circuit setting temporan benchmarks no further than 500 feet <br />apart, <br />(e) Obtain location of existing manholes, storm water inlets and water valves. Detail <br />measure existing manholes to get inverts and sewer sizes; <br />(f) Locate existing utilities that are in the right of ways; <br />(g) Obtain topographic data; <br />(h) Plot the topographic survey and develop existing contours. <br />Task #2: Path Design <br />(a) Prepare plan and profile sheets from the topographic survey; <br />(b) Develop proposed typical sections; <br />(c) Design proposed grades and geometries; <br />(d) Plot existing and proposed cross sections in all areas at intervals of 50 feet: <br />(e) Design the rest area; <br />(f) Prepare preliminary estimate of probable construction costs; <br />(g) Prepare maintenance of traffic plan and construction staging sequences; <br />Engineers Planners Architects Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.