My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Agenda 2-14-12
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
03-13-12 Packet
>
2 Agenda 2-14-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:33:20 AM
Creation date
3/9/2012 12:49:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting — February 14, 2012 <br />the Northeast Neighborhood Revitalization <br />Organization (NNRO) and city <br />representatives. Part of the concept is the <br />continuation of a 10' multi - purpose trail from <br />SR23 down Eddy Street. Initial concepts <br />showed the multi - purpose path ending at <br />Madison Street due to inadequate space as <br />some established building footprints were too <br />close to the right -of -way line. However, it <br />was determined that connecting this path <br />from Madison Street to existing city paths <br />and bike lanes was essential to serve <br />pedestrians and bicyclists; therefore, alternate <br />routes were to be sought. <br />Staff is proposing to expand the study area <br />and add a few additional blocks on the West <br />side of the street to connect the Eddy Street <br />multi - purpose path to the Colfax Avenue <br />bike lanes. DLZ has submitted a new <br />proposal for this expanded area which <br />includes the following scope of services: <br />1. Record street measurements along <br />Cedar, Madison and Frances Streets <br />2. Conduct a windshield survey of the <br />expanded area and document existing <br />street amenities <br />3. Review St. Joseph High School site <br />plans along Notre Dame Avenue <br />4. Schedule additional meetings with St. <br />Joseph High School and city <br />representatives <br />5. Develop an alternate route for the <br />bicyclists and estimate construction <br />costs. <br />The total cost for these services is $6,700. <br />NNRO will split this fee with the <br />Commission and cover 25% of the costs <br />equaling $1,675. Staff requests approval of <br />Resolution No. 3008 and authorization to <br />
The URL can be used to link to this page
Your browser does not support the video tag.