Laserfiche WebLink
- <br />The pela and wire inspector �filad <br />the following report on red <br />l ight at ;Mich igant Street and Howard Street of North Shore Dr ive;. <br />a <br />I1 beg to recowit nd` the placing of a red light at the north end of t% <br />Leeper. Bridge als� a red lightat the corner of .Leeper Avenue and Howard Street. <br />A cement pillar with a red light just east of the sidewalk on -the east s id.e of the <br />Michigan Street in the center; of Howard Street. <br />The; cement pillar should be twelve <br />feet long three feet high, also a red 1 ight be placed can the south side of Howard <br />Rtrect:' about the center -of Leeper Avenue. <br />The following claims were apprdved by the Board. <br />C F. Pease & Co. <br />t e* 00 <br />Taylor Tire Shop <br />12.16 <br />C. F. Pease & Co. <br />8.01 <br />Street and al ley , bapt. <br />19 728• 03 <br />G. R. Kinney' Co. <br />13.94. <br />Felix Builak <br />4225 <br />South Bend S4ply Co. <br />2.86- <br />Sibley Machine T'boL Co. <br />20.84 <br />Frazier & Frazier <br />3.96 <br />J. A. ' Manner ing <br />11.67 <br />Garbage, Dept. <br />458.40 <br />Joseph A. Luther <br />62.88 <br />- J e s e fah= A. Luther <br />43. 50 <br />H. C. Weaver. <br />4, 784.00 - <br />Central Union Tel. Co. <br />6016- <br />Burr ough' s Adding Machine Co. <br />75.00 <br />Central Union Tel. Co. '- L .00 <br />Tuttle Corp: <br />1.00 <br />Interurban tabor Journal <br />17.87 <br />Central Union tal . 'Co. <br />8.25 <br />City Cemetery <br />8675 <br />Street Repair Dept. <br />p P <br />27421 . ' <br />Tuttle Corp. <br />2.25 <br />Peters'on Printing Co. <br />13.50 <br />Building Deptt. <br />.35 ` <br />City Water Works <br />%220100 <br />_ 'Total amount - allowed. <br />F0.883.84 <br />Concerning the improvement ©f th <br />roadway of North Shore Drive <br />from Michigan .St reet to'- Leeper Avenue with aspa <br />t, asphaltic concrete, bitulithiom <br />concrete or br iek in pursuance to resolution No. <br />this being the day for rece iv- <br />in-g and opening bids the Board at 10:00 O'clock <br />n the 14th. day of October 1919 <br />pub l tcly opened and` -read and considered all bids <br />and then a ont inued their meeting <br />until this 22nd. day of October 1919 at 10:00 A. <br />And.thereupon the Board designated.Concrete <br />as the kind of pAvement <br />with which said street is to be improved and fixes <br />the 3rd. day of November 1919 <br />as the time when petitions must be filed and thox2x&xdxknx&kXxftime <br />for c hang ing <br />of the kind of pAvement and the Board hereby continues <br />this matter., -until the 4th. <br />day of November 1919 On the day above named the <br />Boar will <br />d w 1 either <br />then pAss on petition � <br />let said Contract, or reject all bids, <br />' BOARD OF PUBLIC WORKB. <br />G. A. ELLIOTTHARVEY <br />Attested:- <br />F. ROSTISER <br />JOHN F. DEHAVEN <br />Veronica. C. Sweeney <br />Clem of the Board. <br />Dated this`92nd.day of November 1919. <br />a <br />President. <br />