My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two or More 2018 or Newer Single Axle Dump Truck - Spec X - Selking International
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Two or More 2018 or Newer Single Axle Dump Truck - Spec X - Selking International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:29:19 PM
Creation date
10/25/2018 9:18:48 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Filled fi'W by W A Jw')(,',,s <br />'Volrom <br />Ladder: <br />D-Rings: <br />Tarp Rods: <br />Tarp: <br />speed. There shall;also be a control valve located at the rear of <br />the truck to allow an operator to start and stop the conveyor <br />from the rear of the truck. <br />Sewer Department — White Cab, Turquoise Tropic Green Dump (ED NO <br />Bed 97561A. <br />A ladder will be provided for access to dump body. NO <br />Bed shall have 3 D-Rings on each side of bed to mount leaf box. YES NO <br />Tarp rods are to be provided on the body. YE NO <br />Shall have a pull type tarp equal to what the City is currently using. YE NO <br />Mounting of Dump Body <br />Shall have a minimum of three (3) brackets (each side) - 2"x 4" flat iron minimum, at least one at <br />rear, one in center, one at front. Shall be welded at rear and bolted with three (3) 5/8" bolts per <br />bracket (minimum). Hoist cylinder shall be hooked to central hydraulics with 3/4" high pressure <br />hose (two wire minimum). Floor of body to be approximately 54" off ground +/- 2'% All welding <br />to be done at factory on box. Other welding to be certified. Two rear hooks shall be supplied and <br />bolted to rear of frame. LED lights. <br />Electrical: All lighting shall be LED. E)S� NO <br />The wiring junction box is to be located on the right side of 11�1-0 <br />the body a minimum of 58" off the floor. The electrical <br />box is to be completely sealed and waterproof. All wiring <br />to be continuous (without splices) and run inside of a <br />waterproof harness, All connections are to be made inside <br />waterproof junction boxes or within the structure of the <br />body. Warning lights, strobes, and plow lights each to be <br />run off OEM switches. Also included will be a pair of <br />Truck Lite LED Model #8088O or equal plow lights mounted to <br />stainless steel brackets on hood. Plow lights to LED and integral <br />to OEM headlights, Sealed lighting system shall be installed <br />consisting of four (4) nylon tail/brake lights, two (2) on each side, <br />and two (2) Whelen amber nylon alternating strobe flashing <br />lights, one (1) on each side, mounted at top and two backup <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.