My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10092018 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2018
>
10092018 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:25:52 PM
Creation date
10/23/2018 11:22:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 9.2018 304 <br />1 <br />1 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above bids <br />were referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF BIDS — GEMINI AT WASHINGTON/COLFAX APARTMENTS MASONRY <br />AND STAIR REPAIR — PROJECT NO 118-080B (WWDA TIFF <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />BOKON MASONRY, INC. <br />56571 Pear Road <br />South Bend, IN 46619 <br />Bid was signed by: Ryan Bokon <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Bid Bond was not submitted <br />.R <br />Base Bid <br />— Division A <br />$190,171.00 <br />Base Bid <br />— Division B <br />No Bid <br />Unit Prices — Division A <br />Item <br />Description <br />Qty. <br />Unit <br />Unit <br />Total <br />No. <br />Price <br />Amount <br />1 <br />Unit Price: Replace on 31d Floor lintel <br />EA <br />$874.00 <br />below a section of rebuilt parapet <br />2 <br />Unit Price: Replace deteriorated 1 lineal <br />EA <br />$295.00 <br />foot of structural terra cotta with CMU <br />3 <br />Unit Price: credit to repoint each 1 lineal <br />EA <br />$239.00 <br />foot of parapet in lieu of rebuilding <br />PAUL'S WELDING, INC. <br />7930 West 1000 North <br />Nappanee, IN 46550 <br />Bid was signed by: Kyle Miller <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Security Check was submitted <br />BID: <br />Base Bid — Division A No Bid <br />Base Bid — Division B $168,844 <br />Unit Prices — Division A <br />Item <br />Description <br />Qty. <br />Unit <br />Unit <br />Total <br />No. <br />Price <br />Amount <br />1 <br />Unit Price: Replace on 3`d Floor lintel <br />EA <br />No Bid <br />below a section of rebuilt parapet <br />2 <br />Unit Price: Replace deteriorated 1 lineal <br />EA <br />No Bid <br />foot of structural terra cotta with CMU <br />3 <br />Unit Price: credit to repoint each 1 lineal <br />EA <br />No Bid <br />foot of parapet in lieu of rebuilding <br />Upon a motion made by Ms. Maradik, seconded .by Ms. Fritzberg and carried, the above bids <br />were referred to Engineering and Community Investment for review and recommendation. <br />OPENING AND AWARD OF QUOTATIONS — 2018 TREE PLANTING PROJECT NO <br />I I8-048B (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.