My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Prep and Assistance with Fat Daddy's Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Prep and Assistance with Fat Daddy's Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:22:09 AM
Creation date
10/10/2018 3:21:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 16 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , 2018. <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1 — BASIC SERVICES <br />A.1.00 Project Schedule <br />1) All work by the Engineer under this Agreement shall be completed and delivered to the Owner as <br />indicated on the Project Schedule, below. This schedule is dependent on the timely review and <br />input from the Owner, its consultant and agents, and certain review and regulatory agencies to the <br />extent required. <br />1. September 25, 2018 — Engineer receives signed Agreement and Notice to Proceed <br />2. October 12, 2018 — Preliminary Plans and Specifications <br />3. <br />October 19, 2018 — <br />Owner provides comments to the Engineer <br />4. <br />October 23, 2018 — <br />Bid Authorization (only need Notice to Bidders and Cover Sheet) <br />5. <br />October 26, 2018 --- <br />Final Bid Documents submitted to the Owner <br />6. <br />November 1, 2018 <br />— Owner provides comments to the Engineer <br />7. <br />November 6, 2018 ---- <br />Bid Documents Complete <br />8. <br />November 9, 2018 <br />— Bid Advertisement #1 <br />9. <br />November 16, 2018 <br />— Bid Advertisement #2 <br />10. <br />November 20, 2018 <br />-- Pre -Bid meeting <br />11. <br />November 27, 2018 <br />--- Bid Opening <br />12. <br />December 11, 2018 <br />— Bid Award <br />2) The Demolition Phase is anticipated to be four (4) months in duration. <br />A1.01 Preliminary Design Phase <br />1) Engineer shall: <br />1. Conduct two (2) meetings with the Owner regarding the preliminary phase of the project. <br />2. Prepare Preliminary Design Phase documents consisting of preliminary drawings and <br />outline specifications. <br />Provide necessary field surveys and topographic and utility mapping for design purposes <br />within the Project area identified in Exhibit A, Figure No. 1. Utility mapping will be based <br />upon information obtained from utilities. <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.