My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Lafayette Bldg Exterior Renovation - Project No 117-100R - C&S Masonry Restoration LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Lafayette Bldg Exterior Renovation - Project No 117-100R - C&S Masonry Restoration LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:22:45 PM
Creation date
10/10/2018 3:10:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lafayette Building Exterior Renovation <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September, 2018 <br />B. Prepare surfaces to be coated as recommended by water repellent manufacturer for best results. <br />C. Do not start work until masonry mortar substrate is cured a minimum of 60 days. <br />D. Remove loose particles and foreign matter. <br />E. Remove oil and foreign substances with a chemical solvent that will not affect water repellent. <br />F. Coordinate with work of Section 04 0100, Maintenance of Masonry. <br />C, Allow surfaces to dry completely to degree recommended by water repellent manufacturer <br />before starting coating work. <br />3.3 APPLICATION <br />A. Apply water repellent in accordance with manufacturer's instructions, using procedures and <br />application methods recommended as producing the best results. <br />B. Apply at rate recommended by manufacturer, continuously over entire surface. <br />C. Apply two coats, minimurn. <br />D. Remove water repellent from unintended surfaces immediately by a method instructed by water <br />repellent manufacturer. <br />E. Provide manufacturer's field service representative to inspect preparation and application work <br />continuously during entire application period to ensure that manufacturer's "best practices" for <br />preparation and application are being followed. <br />END OF SECTION <br />WATER REPELLENTS <br />07 1900 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.