REGULAR MEETING <br />SEPTEMBER 25, 2018 286 <br />Quotation was submitted by Matthew Cain <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $159,367.00 <br />SELGE CONSTRUCTION CO.. INC <br />2833 S. 111h Street <br />Niles, MI 49120 <br />Quotation was submitted by Robert Kuhns <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $150,660.50 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above quotations <br />were referred to Wastewater for review and recommendation. <br />AWARD BID — ONE (1) OR MORE 2018 OR NEWER EMERGENCY MEDICAL VEHICLE <br />— SPEC S (FIRE DEPARTMENT) <br />Mr. Jeff Hudak, Central Services, advised the Board that on August 28, 2018, bids were received <br />and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Horton Emergency Vehicles, 3800 McDowell Road, Grove City, OH 43123, in the amount of <br />$259,760. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />bid be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD BID — GEMINI WASHINGTON/COLFAX APARTMENT IMPROVEMENTS — <br />PROJECT NO. 118-080A(WWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on September 11, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Dudeck Roofing and Sheet Metal, 1634 S. Franklin Street, South Bend, IN 46613, in the amount <br />of $128,820. Therefore, Ms. Maradik made a motion that the recommendation be accepted and <br />the bid be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD BID — J.C. LAUBER SITE IMPROVEMENTS — PROJECT NO. 118-083B REDA <br />TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on September 20, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in the amount <br />of $373,528 for the Base Bid plus Alternates 1 and 3. Therefore, Ms. Maradik made a motion <br />that the recommendation be accepted and the bid be awarded as outlined above. Ms. Dorau <br />seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 1 — LIGHT UP SOUTH BEND — RIVERSIDE LIGHTING <br />—PROJECT NO. 118-011A (COIT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Martell Electric LLC, 4601 Cleveland Road, South Bend, IN 46628, indicating the contract <br />amount be increased by $6,512, and an additional sixty-seven (67) days for a new contract sum, <br />including this Change Order, in the amount of $95,228, and a new completion date of October <br />16, 2018. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the Change <br />Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — LINCOLN WAY WEST AND CHARLES MARTIN <br />SR. DRIVE INTERSECTION IMPROVEMENTS — PROJECT NO. 117-072A RWDA TIF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Selge Construction Co., Inc., 2833 S. I I1h Street, Niles, MI 49120, indicating the contract <br />amount be increased by $29,097.29 and an additional two (2) days for a new contract sum, <br />including this Change Order, in the amount of $1,160,109.44. Upon a motion made by Ms. <br />Maradik, seconded by Ms. Dorau and carried, the Change Order was approved. <br />