Laserfiche WebLink
5. Verify the consultant has provided a fee proposal and the fee proposal includes the following: <br />a. H itemization of task elements with estimated hours by employee classification. <br />b. 0 Cost calculations show the overhead rate and profit rate has been applied. <br />6. Analyze the Consultant Fee proposal. <br />a. Confirm the task elements are relevant to the scope of work. <br />b. Confirm the proposal does not exceed the Escalation Values for INDOT Consultant Contracts. INDOT uses <br />the Bureau of Labor and Statistics Employment Cost Index (ECI) to determine appropriate escalation values. <br />INDOT's guidelines are available under the Contract Compensation Information section at: <br />iLqll//www,iii.�-YOV/itidot/2730.litni. <br />c. Z Confirm the overhead rate used in the fee proposal is consistent with or lower than the rate shown in the <br />consultant's prequalification letter. <br />d. Z Confirm, to the extent possible, major task element and overall cost totals are not excessive. <br />7. If the contract is for Construction Inspection, is an Engineer's Assignment letter attached? <br />a. R Not Applicable <br />b. EEngineer's Assignment is attached. <br />1 1) <br />ERC Signature: -Ax �,). -W Date: 9/14/1 8 <br />Printed Name: Ky(/eW. Silvers <br />Page 2 of 2 <br />