My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2972 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Fellows Street Corridor Improvement Project - Supplement #1) (relates to 2865-11)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2972 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Fellows Street Corridor Improvement Project - Supplement #1) (relates to 2865-11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 11:38:36 AM
Creation date
1/11/2012 2:52:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LO, task will be shown on the final construction plans. Specifications will be developed utilizing <br />standard specifications and general conditions provided by the City supplemented (if <br />needed) with CBBEL standard technical specifications. <br />G <br />CBBEL staff will provide an opinion of probable cost based on the final construction plans. <br />This opinion will be based on the judgment of CBBEL engineering staff, supplemented by <br />local construction project history information provided by the City. An itemized list of the <br />estimated quantities or work units required to complete the job will be included. <br />It is anticipated that during the progress of this task, CBBEL will meet with the City staff and <br />other necessary local representatives to discuss the progress of the design. Three meetings <br />are included in the proposed fee. We also included coordination with INDOT regarding the <br />Fellows and Ireland intersection. <br />Schedule to complete: 4 Months from approval date <br />Task 2 - Rule 5 Permit: <br />A Rule 5 permit (IDEM) will be required for this project. CBBEL will prepare the submittal <br />package and required documentation including the publication of a legal notice in a local <br />newspaper. The package will be provided to the City for signature and submittal to IDEM. <br />Schedule: 30 days from completion of final design <br />Task 3 - Bid Services: <br />CBBEL will provide three full copies of the final design documents to the City prior to <br />bidding. CBBEL will assist the City in conducting a pre -bid conference at a location of the <br />City's choosing. CBBEL will address contractor questions and prepare and issue addenda, <br />as needed. Following bid opening, CBBEL will compile and certify bid tabulation sheets and <br />provide a contract award recommendation to the City. It is assumed that City staff or <br />representatives will coordinate the bid collection, bid opening, and the preparation of the <br />construction agreement. <br />Schedule: Assumed 8 week bid period <br />Total Estimated Fee for Phase 2 is $183,000.00 <br />ESTIMATED FEE <br />If and when the value of work accomplished exceeds 80% of the total estimated fee for each <br />Phase, we will assess the remaining work and will notify you, in writing, if additional <br />compensation will be needed. If additional compensation is needed, we will do no work <br />beyond the total estimated fee until you issue a written notice accepting the additional <br />charges. <br />We will bill you monthly, on a time and material basis, for assigned tasks in accordance with <br />our attached Standard Charges for Professional Services. In addition, our contract will be <br />established in accordance with the attached General Terms and Conditions. These General <br />Christopher B. Burke Engineering Ltd. City of South Bend: Fellows Street Corridor Improvements, Phase II <br />01.P110093.00001 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.