Laserfiche WebLink
.J <br />group p City of South Bend Fire Department <br />Scope & Fee Proposal <br />scope for mechanical, electrical and plumbing requirements is <br />listed in Exhibit "B" attached to this document. <br />• R. W. ARMSTRONG electrical drawings shall delineate all <br />power, conduit and circuits for design intent review by DSG. <br />• R. W. ARMSTRONG will provide for electrical service to be <br />brought to the site via transformer. The training buildings should <br />be supplied with standard panels within the interior, extended <br />from the main service <br />TASK 1 -3 Construction Documentation <br />This task is to complete the construction documentation for the project including <br />drawings, specifications, structural and energy calculations. R. W. <br />ARMSTRONG's TEAM will prepare all of the required documents in accordance <br />with the current accepted International Building Codes with issued Amendments, <br />as incorporated by City of South Bend, and their applicable local codes. DSG <br />will provide support for this process with cooperation in clarifying the Design <br />Development drawings and specifications for implementation into the final project <br />documents. <br />Meetings: <br />o DSG will attend One (1) Working meeting to review final <br />Construction Documents with owner and Project Architect <br />TEAM in South Bend, Indiana <br />Deliverables: DSG & R.W. Armstrong will work together to provide the: <br />• Electronic AutoCAD files for training element details. <br />• Electronic 100% Product Specifications <br />• Redline drawing review comments <br />• Final construction cost estimate input including actual vendor <br />costs and estimates through coordinated work of both DSG and <br />R. W. Armstrong TEAM <br />TASK 1 -4 Project TEAM Coordination <br />This task is the interactive coordination efforts between the Project Architect's <br />team of sub - consultants. These would include civil, structural, electrical, <br />mechanical, plumbing, landscape, etc. <br />o Project Architect TEAM Kick -Off Meeting concurrent with Design <br />Development <br />DSG will meet with R. W. ARMSTRONG and its sub - consultants <br />to coordinate the project design concepts. The goals of the <br />meeting are to openly discuss the project and the peculiar <br />elements that comprise a training facility. Also to be discussed <br />are the roles and responsibilities of each discipline and the <br />37 Southampton CT — Newport Beach CA 92660 Telephone 949/683 -7110 <br />