My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
12-13-11 Packet
>
6C (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:55:58 AM
Creation date
12/9/2011 1:14:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
& <br />To Redevelopment Commission <br />From Geri Hathaway, Ignition Park Director <br />Subject Ignition Park - Circle Building Concept Design <br />Date December 13, 2011 <br />The central focal point of Ignition Park's Master Plan is a circle with basin for storm <br />water retention, gathering green space with solar trees, wind spire that defines the <br />hub of the park and a building or buildings that enhance the most significant <br />location within the Park. Definition of design requirements for these structures is <br />imperative if we are to control the look of the most important and visible elements <br />within the Park. <br />It is prudent that we initiate the definition of these structures at this time in order to <br />be prepared to respond to the tenants Ignition Park will attract. Otherwise, haste <br />under pressure will drive us to an unintended solution with a facility that is less <br />than it can be and a lost opportunity for Ignition Park. We have an obligation to this <br />community to be better stewards. <br />Economic Development asks for your approval of BSA LifeStructures proposal for <br />the definition of this building(s) concept design in the amount of $45,000 including <br />reimbursables. <br />
The URL can be used to link to this page
Your browser does not support the video tag.