My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (13)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
12-13-11 Packet
>
6B (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:58:45 AM
Creation date
12/9/2011 1:08:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />monroe circL6 <br />C 0 M M U N I T Y C E N T E R <br />Phase 1 of the property development will consist of the renovation of the existing building, curb, <br />sidewalk, parking spaces, and removal of the existing Harmon Glass sign. In this phase, the existing <br />building will be renovated for the purpose of serving as Carpenter's Hands center of operations to <br />mobilize the community at -large to volunteer and /or donate for various community construction <br />projects while mentoring and teaching basic trade skills to community residents who have a desire to <br />participate. This group got its start with the renovation of MC3, is currently spearheading the renovation <br />of the 747 Center For The Homeless project for homeless veterans, and will be the primary source for <br />MC3's future construction developments including the Harmon Glass project. The renovated facility's <br />interior, as proposed, will contain 3 areas: Tool Crib, Working space, and a small office area. The timeline <br />for Phase 1 completion is July, 2012. <br />In Phase 2, the future expansion of the Harmon Glass site will provide additional structures containing <br />state of the Art 215L century technology and multi - purposed spaces such as additional offices, <br />conference /classrooms, a commercial kitchen, and more. Phase 2 timeline for completion is to be <br />determined. <br />MC3 proposes to develop the Harmon Glass property consistent with the architecture, beauty, and <br />integrity of design already demonstrated by the recent Coveleski Park renovations as well as the <br />Monroe Circle Community Center's existing facility structure. <br />I thank you Ms Jones and your fellow Redevelopment Commission Board members for your <br />consideration of the Monroe Circle Community Center's non conforming bid proposal. <br />Sincerely, <br />(! r� 7 <br />`�Roy C King ill <br />Dir. Monroe Circle CommunitlCe er <br />Iking @gccwired.com <br />574 -2 3500 <br />Dan Blacketor <br />President, Entermission Inc, Board <br />Jack Magruder <br />Secretary, Entermission Inc, Board <br />Enclosures (3) <br />An outreach of Granger Community Church — 630 E. University Dr. — Granger, IN — 46530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.