Laserfiche WebLink
AN r1 TBE TROY ER GRO V 1 1 II.C. <br />II Planning • Design ■ Construction <br />November 11, 2011 <br />Mr. David Relos <br />Economic Development Planner <br />City of South Bend <br />Community &c Economic Development <br />227 W. Jefferson Blvd. Ste. 1200 S <br />South Bend, IN 46601 <br />Re: Fagade Studies — Phase 11 <br />Dear Mr. Relos: <br />We are pleased to offer to you our Architectural Services to complete the construction documentation, <br />bidding, and construction administration phases for the new facades of the Skyway Office Building and <br />associated fencing, the Skyway Bridge, the E. Blair Warner office building, the bank, and MarMain <br />pharmacy. We have not included the N1PSCO Building as Memorial Hospital of South Bend has yet to <br />finalize requirements for the property at this time. We have listed the components of each building and <br />broken the 2012 versus the 2015 phases out separately in this proposal. Thank you for your continued <br />confidence in our design team. <br />Skyway Office Building and Skyway Bride — 2012 phase <br />We understand that budgets of $1,000,000 for the Skyway Office Building and $1,100,000 for the <br />Skyway Bridge have been approved for expenditures in 2012. We also understand these amounts will <br />need to cover construction and design fees. <br />The design for the Skyway Office Building will need to be altered. The current design's probable cost is <br />$2,625,000 without design fees. The design team has included in our proposed services working with <br />Gibson -Lewis for construction cost estimation to determine the scope of the fagade treatments. We have <br />allowed a maximum of two design review meetings/presentations; additional review <br />meetings/presentations will be done at time and expense. <br />The Troyer Group has copies of the original Construction Documentation for both the Skyway Office <br />Building and the Skyway Bridge. This will aid us in verifying existing conditions for both of these <br />facades. We have included field measuring of both in our services to confirm existing as -built condition. <br />We have also included additional facade treatments on the Skyway Office Building and the fencing for <br />both the north and south property (as shown in the renderings) in the bid package. The fencing has <br />probably construction cost of $100,000 (North) and $185,000 (South). This will allow us to have <br />550 Union Street, Mishawaka, IN 46644 P 574.269.9976 F 574.259.9882 www.troyergroup.com <br />