Laserfiche WebLink
i <br />Board ordered the sum of Five Hundred ($500,00) Dollars held up <br />by City Controller on order of the Board on Assessment roll for pavement of North <br />Alain. Street, released to the White Construction Company. <br />• Estimated cost of Marietta Street pipe,sever from Pennsylvania <br />Avenue to Broadwwy was filed ,at,........$ 841.00, <br />Estimated cost of Pipe sewer on Francis Street from Corby Street <br />to Howard Street was filed at.099000090.$19332.00 <br />Petition received read and referred to the Light Inspector <br />for light at Robinson Street fxxx at corner of Calvert Streets. <br />Petition filed for pipe sewer on Seeberger Drive from Michigan <br />Street to Fellows Street. Resolution/'orlred. <br />Q. Petition filed by Whitcomb and Keller for Wideningg of Seeberger <br />Drive from Michigan Streett to St. Joseph Street. Resolution.ordered. <br />Petition filed by Whitcomb and Keller for walks, curbing and <br />paving of Woodward Avenue from Hudson Avenue to the tracks of Michigan Central <br />Railwoad Co, and Terrace Avenue from Portage Avenue to Woodward Avenue. Resolution <br />ordered. <br />Petition received to improve entrance to alley opposite Keller <br />Street running east Prom Portage.Ave nue Ty removal of telephone'or light co. pole <br />at least ten feet from its present position, and making round corners to curb as <br />described in an attached drawing, filed by:Dr, Wirt,,This matter referred to the <br />Pole and dire Inspector. <br />Referred to pole and wire inspector to investigate the necessity <br />of the removal of a pole near,:entrance to garage on rear of lot owned by Dr. Walsh <br />on Marion Street in the 1st or 8nd. alley west of Lafayette Blvd, <br />W. Sibley requested that a light be placed at the soktheast <br />corner of Eddy Street and Jefferson Blvd, -as red light on opposite corner diagonally <br />across does not shed sufficient radiance. Same referred to the Inspector for report, <br />Contracts awarded as follows:- <br />Contract for sewer on Crescent Avenue from Hill Street to 135ft. <br />crest of west line of St. Louis Blvd. awarded to Hoban & Roach at,,,..$917.50 <br />Contract for grade, curb and walk on Mumford Court from Dayton <br />.,Street to Calvert Street awarded to Whitcomb & Keller at......:.......$1,284.55 <br />Bids received on Grade, curb and walk on Kendall Street over <br />Engineer's estimate, rejected and the advertising of bids were deferred until <br />February .27th.,, 1923 at 9:99 A.M. <br />Estimated cost of pipe sewer on Scout Street from Indiana n <br />Avenue to Calvert Street filed at............ ,$5,536.00 <br />Estimated cost of Trunk sewer in Weidler's Add. xx t at $329820.00 <br />