My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Crossroads Ambulance Sales & Service LLC - Part 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Crossroads Ambulance Sales & Service LLC - Part 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:48:54 AM
Creation date
8/30/2018 9:09:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2019 International MV/PL Custom Titan 170 <br />Type I Ambulance Proposal Specification <br />X1. Autocoat LV650 Clear Coat Mixing Process <br />1. Mix Autocoat LV650 Clear Coat at a ratio of 522 <br />a. 5 parts LV650 Clear <br />b. 2 parts LV650 Hardener <br />c. 2 parts LV650 Reducer <br />2. Once it is mixed, Autocoat LV650 Clear has a pot life of 1.5 hours at 70 degrees F. <br />XII. Application of Autocoat LV650 Clear Coat <br />1. Apply three full wet coats allowing a 5 to 10 minute flash off period between each coat. <br />2, Adjust fan pattern and atomizing air pressure to minimize texture and overspray. <br />3. Force drying of Autocoat LV660 Clear <br />a. Allow 10 to 15 minute flash in booth after application of second coat. <br />b. Bake at 140F for 45 minutes. <br />c, Allow a 10 minute cool down in booth. <br />d. Air dry for approximately 8 hours at 70F prior to any polish or detailing. <br />XIII. Slikkens System Dry Film Build Reguirements <br />1. High Build Surfacer Gray --- 2.0 to 2.7 mils per coat. ( not included in total film build calculation) <br />2. E Coat --- LV260 Primer EP --- One coat at 1.0 to 1.5 mils per coat. <br />3. Primer Seater --- LV650---One coat at 1.0 to 1.4 mils per coat. <br />4. Base Coat--- Autobase Plus --- Two to three coats at 0.3 to 0.4 mils per coat. <br />5. Clear Coat --- LV650 Clear---Th ree coats at 0. 9 to 1 � I m ils pe r coat. <br />6. Total Dry Film Build System range---5.7 to 7.4 mils. <br />7. Total Dry Film Build System after detail/polish---4.7 to 6.4 mils. <br />PAINT CORROSION PROTECTION: <br />All exterior fastener locations that penetrate the paint on the modular body are to be treated with Electrolysis Corrosion <br />Kontrol (ECK). Every external fastener hole shall have ECK brushed into and around the hole for full coverage. The <br />perimeter of the hole shall be covered with a minimum of .5 diameter of ECK. This is to protect the head of the fastener <br />from touching the painted surface. All applications of ECK are to take place before component mounting. The fasteners <br />that are included in this process are for the following components: Lights, Light Bars, Hinges, Diamond plate panels, <br />Entrance and compartment door panels, fuel fill, license plate holder, Shoreline, Vent Covers, Rain Gutters, Rub Rails, <br />Fenderettes and Door Grabbers. Additional items that are mounted to the painted body will also be included. When an <br />item is cut into the body causing an unpainted edge, the unpainted edge shall be completely coated with ECK prior to <br />component mounting. <br />A4539-0001 08/24/18 <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.