My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/09/1922 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1922
>
05/09/1922 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:25:07 PM
Creation date
8/22/2018 9:24:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/9/1922
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board met in. regular session at 9:00 A.M. All members present. <br />City Engineer F. J..Anderson present. <br />A+U�rnqy Daniel Rich a red bbef a the Bo d d stated that- his <br />Client living ,at< t ie soul west corner -a ara atta ��vd. and �ivision` Street objected. <br />t "having the f1a n's house moved over to their corner from the northeast corner <br />of Lafayette Blvd. and Division Street where same has been located for yearst This <br />matter discussed and referred to the City Attorneyfor investigation. <br />Building Commissioner took up matter of purchasing an adding <br />machine for his department , Board advised Mr. Davis to have propositions for <br />machines submitted Tuesday May 16th.,, 1922. at 10:00 A.M.. _ <br />The following resolittion approved by the Board. <br />R E S 0 L U T I 0 N. <br />Resolved, by the Board wba Wherever approach is to be <br />made by parties for priyat# driveway into their property <br />> same is to be Eighteen 18 ) inches where combined curb.. <br />and walk is used, and returne-t and proper drainage to <br />be maintained in all cases.- v <br />Request from Park Board for use of small roller on Ciit3yt iolf Course <br />and matter discussed and upon recommendation of Street Commissioner and Ci y ngineer <br />ermission with. -held on account of roller having insufficient power for acreage <br />olling and up hill work. <br />Pro e t o�.ei earedand resented petitio for r de curb and <br />walk on SaneomeiA enupe j gm a Street forth The B ard� advi�e� Uat more <br />property owners- s gn saig peton a ore same. wou d be gran . <br />Thetter of qtree ars 1 t s di o St. Jose hh S eet s <br />c s .ss1d aidr1hiie Tot yowacars a sia one refits toNeon or inves�iga rion a as <br />Isaac Van Trump of Chicago, Ill. appeared before the Board and <br />presented contracts which were signed as follows by the Board. <br />Chicago, Ill. May 9,1922.- <br />Honorable Board of Public Works, <br />South Band, Indiana. <br />Gentleman: - <br />We hereby offer to test and inspect, in the same throughly intelligent <br />and scientific manner as heretofore, the asphalt paving awarded in your City during <br />the year 1922, on the following basis:- <br />1. We agree to place an experienced asphalt tnppector at the Contractor's <br />asphalt plant during the entire period of preparing the paving mixtures, for the <br />purpose of seeing that the specifications are properly interpreted by the Contractor <br />and that the mixtures are uniform and correct in every respect to successfully <br />meet your local traffic and climatic conditions. No mixture will be permitted to <br />leave the plant until same has been approved by the inspector as being suitable <br />for the particular place where it is to be laid. Whemover it is necessary to change <br />the proportions of the ingredients in the mixture to accommodate it to a changed <br />traffic of foundation condition, the inspector is fully qualified, acting under our <br />personal instructions, to make such change. <br />2. We agree to make at least one personal visit to your work for each <br />159000 square yards of finished pavement, out first visit to be made at the time <br />of starting the asphalt plant on your work to personally standardize and regulate <br />the ingredients, and subsequent visits at fairly regular intervals during the pro- <br />gress of the work. <br />3 We agree to assit the Contractor in the selection of the materials most <br />suitable for yo r work, analyzingin advance of his orderingsame such sam ies, <br />subnitted to us b the Contracto, or your Engineer with tat ob.iect in New . This <br />prevents the contractor from ordering Into hi plant site materials which, while <br />fully meetin the requirements of your specifications, may still be very unsatis- <br />factory for �he particular purpose intended. <br />4. We agree to make careful analyzses Cf all raw materials before permit - <br />tin the Contractor to use same in your work reijeating such materials as are un- <br />sui able for your work, and sending copies of al tests to your Engineer. <br />5 We agree to annalyze.:the samples of asphalt and fluxing oils submitted <br />with the bids of tie Contractors advising your Engineer as to which materials comply <br />with the specifications or are Co <br />ontractors satisfactory for your purpose. <br />
The URL can be used to link to this page
Your browser does not support the video tag.