Laserfiche WebLink
IL. Over 1,500 CFM capacity.................................................. 6GM 120.00 <br /> f 8) Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> a. 1 to 5 horsepower, each........................................................15.00 17.00 <br /> b. 6 to 10 horsepower, each,.................................... ... . ...... A8 30.00 <br /> c. More than 10 horsepower, each............................................40,00 45.00 <br /> Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br /> each: <br /> L. Up to 7 %z tons.................................................................... 40.08 45.00 <br /> b. 7 1/2 tons or more................................................................ 68:48 70.00 <br /> Heat pumps: <br /> a. 1,000 to 60,000 Btu's input.................................... 2$A9 30.00 <br /> b. 60,000 to 300,000 Btu's: ' <br /> 1. Up to 7 % tons, each.................................................4488 45.00 <br /> 2. 7 % tons or more, each..............................................75.08 85.00 <br /> c. Earth, coupled water source...................................................38-08 60.00 <br /> LUI Boilers, steam or hot water: <br /> a. Up to 300,000 Btu's............................................. 2488 30.00 <br /> b. 300,000 Btu's or more..........................................................5498 60.00 <br /> Through-wall combination air conditioning/heating and VAV boxes w/coil: <br /> a. First unit................................................................................20.90 30.00 <br /> b. Each additional unit..............................................................1008 12.00 <br /> c. Solar heat units..................................................................... 3400 60.00 <br /> Air handlers <br /> a. 400 CFM to 2,500 CFM........................................................23:49 30.00 <br /> b. Over 2,500 CFM....................................................................69.08 70.00 <br /> (14) Back-up generators —gas line: <br /> a. 10 Kv or less. 30.00 <br /> b. Over 10 Kv. 50.00 <br /> Duct and register: <br /> a. First 15 openings,-per s stem..................................... 30.00 <br /> b. Each opening thereafter,per system,,... ................ . 1.00 <br /> ChangeFee.......:.......................................—--...................... <br /> Gas reconnection, each....................................................................... 29,40 3000 <br /> Gas piping (distribution of piping to equipment) to be included on permit <br /> application <br /> Each gas piping system, per outl et.......................................... 2:49 3.00 <br /> Woodburning stoves, per flue (including chimney and chimney <br /> connector)..................................................................... 28:00 30.00 <br /> (19) Each reinspection fee..............................................................,......,......25-09 30.00 <br /> (20) Each additional final inspection............................................................50.0 60.00 <br /> 10 <br />