My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/28/1915 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1915
>
09/28/1915 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:53:23 PM
Creation date
8/16/2018 12:39:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/28/1915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
770 <br />Tuesday September 28th.01915. <br />Board met in regular session at 10:00 A.N. Kr A. H. Rice absent. <br />W. W. Sibley, Chris. Aichele and Fred P. Fatter appeared before the Board <br />and remonstrated against Staples and Ackerman putting in water connections on <br />Indiana Avenue from Miami Street to Franklin Street, as same was.not in compliance <br />with plumbing rules. The Board instructed the City Engineer to notify Staples & <br />Ackerman to stop work on same until this matter was fixed up. <br />Mrs.Ella Brown appeared before the Board and requested that a water tap <br />ebe eliminated from part of her lot No. 63 on Indiana.Avenue. The Board notified <br />Mrs. Brown it agreeablewith contractor v&o had contract for putting water taps in on <br />Indiana Avenue, that they would cancel tap from part of Lot 63 , <br />The Board ordered that the matter of the grand Trunk Western Ry. Co. <br />planking between their tracks on Di%4 sion Street this City be referred to the legal <br />✓ department for enforcement. <br />Attorney Oare appeared before the Board in regard to petition filed <br />August 31st.11915. for petition for the Vandalia Railroad Company to lay a sidetrack <br />his a alley'between Main and Lafayette Streets and Sample and Garst Streets same to be, <br />a continuation of the track now accommodating the Campbell Folding Paper Box Company. <br />The Board took said matter under advisement for one week. <br />Communication received from Lucius B. Andrus of the Indiana & Michigan <br />Elea. Company stating that an 80 C.P. street light was placed in service at the corner <br />of Walsh and Madison Street on Sept, 13,1915 Lamp No. 931. <br />Excavation bond for the sum of One Thousand ($1,000.00)Dollars_. <br />signed by Thilman Brothers was approved by the Board. <br />September 29#1915. <br />To the Hon. Board of Public Works <br />of the City of South Bend, Indiana. <br />Gentlemen:- <br />I herewith presented partial <br />estimate No. 1. <br />for the ; Uich igan Street Trunk <br />sewer improvement from La Salle Avenue <br />to Monroe Street <br />in accordance with the terms <br />of the contract between the City and <br />J. H. Chaill, Contractor. <br />Completed work. <br />1010. Lineal feet of 60 inch pipe at <br />$12.73 per foot <br />#129857.30 <br />1515 " " of 54 " " " <br />11.17 " " <br />169922.55 <br />220 " " of 48 " " " <br />9.53 " " <br />2,162.60 <br />136,.1/2 " " of Naholes " <br />4.00 " " <br />645.00 <br />1776 " " of S incur pipe " <br />1.25 " " <br />2,220.00 <br />8 Manhole covers <br />7.50 each <br />349769.45 <br />65% of which amounts to ........................... .............�22,599.49 <br />Respectfully submitted. <br />Frederick J. Anderson <br />City Engineer. <br />The above estimate - was allowed. <br />In regard toncomplaint about poles being outside of new curb on east sid <br />side of N. Hill Street between Corby and Howard Street, the Board ordered that the <br />Home Telephone Company be notified to replace said poles inside of the curb. <br />
The URL can be used to link to this page
Your browser does not support the video tag.