My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/14/1915 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1915
>
09/14/1915 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:51:53 PM
Creation date
8/16/2018 12:27:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/14/1915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board met in regular session at 10:00 A.M. All members present. <br />Mr. Campbell, Supt., for the J. H. Cahill Contractors on Michigan Street <br />,,"Trunk sewer from La Salle Avenue to Monroe Street, under Improvement Resolution No. <br />367 appeared before the Board and akked for an extension of time in which to complete <br />above mentioned trunk sewer, stating that, owing to the rainy weather and labor condi- <br />tions, same was not completed at tiro stated in contract. The Board took said matter <br />under advisement until 7145, P.M, this" 14th. day of September,1915. <br />Communication received in regard to placing Martin Cole as an inspector <br />/ on City work from John A. Hibberd. Same placed on file.. <br />Bond and contract for gravel pavement on Prairie Avvenue from Grant Street <br />to Ewing,Avenue signed by Perkins and Perkins , was approved by the Board. <br />Board instructed the City Civil Engineer to prepareplans and specifications <br />for a fence along the Lincoln Way East near the Grand Trunk Western By. along the top <br />of the River bank on the easterly side of Lincoln Way East from a point about 420 <br />feet north of the Grand Trunk Western Ry. tracks to a part 166 feet south of said <br />track. The City Engineer was also instructed to notify contractors and receive bids <br />for the above fence. <br />T, <br />It is hereby ordered by unanimous consent of the Board of Public Works, that <br />bids received September 7th.91915 for grade, curb and pavement on. -Bartlett Street <br />from St. Joseph Street to Riverside Drive under Improvement Resolution No. 401 be <br />rejected and readvertised. It was also resolved that the grading be eliminated from <br />specifications for grade, curb and pavemnt on Bartlett Street, under Improvement <br />Resolution No. 401, the same to be done as per agreement by the Park Commissioners. <br />Resolved further that bids be advertised for curb and pavement on Bartlett <br />Street from Sti, Joseph Street to Riverside Drive, under Improvement Resolution No. 401 <br />on the 23td day of September91915 and on the 30h. day of September,1915 in the South <br />Bend Daily Tribune, stating that bids will be received on the 12th . day of October, <br />1915 at 10 :00 A.M. The Board reserves the right to r e jest any and al. 1 bids. <br />Bond and contract for Graviling of Prairie Avenue from grant Street to <br />Ewing Avenue, under Improvement Resolution No.400 signed by Perkins & Perkins was <br />approved by .the Board. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.