Laserfiche WebLink
EddyStreet-Edison Road Annexation Area 6 <br />Streets -Edison Road will be added to the City's roadway inventory. The mileage of the existing <br />road and any new roads that might be developed within the property will add to the State's <br />payments to the Motor Vehicle Highway Fund and Local Road and Street Fund sufficient for street <br />maintenance, sweeping, and snow removal. As presented, the annexed segments of Edison Road <br />will be maintained by City forces. Landscaping, mowing and maintenance of such for the portion <br />of Edison Road within the annexation area will be completed by the University of Notre Dame. <br />Drainage Plan -Drainage facilities will be required to be constructed by the developer anal meet <br />the latest City of South Bend standards. <br />General Budget Analysis <br />2001 Actual Budget Report for the Department: <br />Expenditures: <br />Miles of Roadway in City: <br />Cost per Mile: <br />New Mileage within Area: <br />Estimated Maintenance cost <br />for Annexation Area per year: <br />B. Police Department <br />$6,228,676 <br />@$13,224 <br />@.42 miles (2,216.9 feet) <br />@$5,554 <br />The Annexation Area would be expected to be added to the already existing BEAT 11. Police patrols, <br />traffic enforcement, and emergency responses will be part of the services the City will offer to this <br />area. This proposed annexation would require officers to cover a relatively small additional area to <br />this beat. <br />The Annexation Area is located in an area of the city that is expected to continue to grow, both in <br />commercial development as well as residential. At this time it is not expected that this annexation <br />would cause calls for service to increase significantly and it is not anticipated that it will be <br />necessary to increase police patrols beyond the already existing beat patrol at this time. The area <br />under consideration is not expected to cause any unusual problems. <br />At the present time the cost for servicing the proposed area is not expected to impact the existing <br />budget of the Police Department with any significance. However, this area, as well as all other <br />areas of the City, will continually be monitored for level of service demands and other criteria that <br />would necessitate additional resources through budgetary increases or possibly shifting of existing <br />resources, such as a beat restructure. <br />