Laserfiche WebLink
foot corridor from the site's boundary with <br />public rights -of -way. <br />a. Each newly constructed section of <br />bikepath shall align with the existing <br />bikepath sections on adjacent <br />properties. <br />li• �ti WI <br />Utlllty Screenln9 <br />METRMAER <br />o1R11 Oppvi�w�t« <br />NMl —r-4, <br />Blackthom and to minimize utility costs and <br />adverse visual impacts caused by utility structures <br />and appurtenances. The guidelines are as follows: <br />1. All permanent utility lines shall be <br />underground. <br />2. No cesspool, septic tank or sewage <br />b. Owners are encouraged to wind the disposal plant shall be erected maintained <br />path through berms and landscaping. upon any part of Blackthom. The proper <br />The bikepath shall nor run parallel with use of constructed or reconstructed <br />the right of way. wetland technology is encouraged for any <br />on -site stormwater treatment. <br />c. The bikepath shall be seven feet in <br />width. 3. Transformers shall be grouped with utility <br />meters where possible and shall be <br />d. Owners are encouraged to construct screened in a manner approved by the <br />addition paths on each Lot. Committee. <br />e. Owners are encouraged to provide <br />bike storage areas on each Site for <br />employees. <br />SITE UTILITIES <br />The purpose of the Site Utilities Guidelines is to <br />promote the coordinated development of utilities in <br />4. Utility appurtenances including telephone <br />pedestals, utility meters, irrigation system <br />backflow preventers, transformers, etc. <br />are not to be visible from adjacent sites, <br />parking areas, public streets, pedestrian <br />walkways and bikepaths and shall be <br />screened in a manner approved by the <br />Committee. <br />11 Blackthron Corporate Center - Development Guidelines <br />411193 <br />