Laserfiche WebLink
(�, IF ( 1) <br />To Redevelopment Commission <br />From Geri Hathaway, Ignition Park Director <br />Subject Ignition Park - Accelerator / Prototyping Building(s) Pre - Design <br />Date October 25, 2011 <br />The central focal point of Ignition Park's Master Plan is a circle with basin for storm <br />water retention, gathering green space with solar trees, wind spire that defines the <br />hub of the park and a building or buildings that enhance the most significant <br />location within the Park. Definition of design requirements for these structures is <br />imperative if we are to control the look of the most important and visible elements <br />within the Park. <br />There have been discussions about the need for a multi - function building(s) that <br />would provide for businesses that have graduated beyond incubation to <br />acceleration, for product prototyping and for existing regional companies that are <br />expanding into new areas of business through innovation. <br />In an effort to respond with flexibility to the market the schematic design may result <br />in one building that can be accomplished in phases or two buildings that will look <br />not just like cooperative neighbors, but rather like two parts of a single element. To <br />be prepared to respond to the tenants Ignition Park will attract it is prudent that we <br />initiate the definition of these structures at this time. Otherwise, haste under <br />pressure will drive us to an unintended solution with a facility that is less than it can <br />be and a lost opportunity for Ignition Park. We have an obligation to this <br />community to be better stewards. <br />Economic Development asks for your approval of BSA LifeStructures proposal for <br />the definition of the architectural and engineering pre- design for these buildings in <br />the amount of $115,000. <br />